Interface between test object and test environment Sample Clauses

Interface between test object and test environment. Figure 4 and Figure 5 show the physical interfaces between the SOC cell / SOC stack test object and the test environment. The physical interfaces between the test environment (test station) and the SOC cell/stack test object can be separated in media, electric, heat and mechanic interfaces. Media interfaces are the reactants inlet and outlet; electric interfaces are the load and power supply and voltage wiring; heat interface is the oven and the mechanic interface is to mount the cell/stack on the test station which may supply compression force to the cell/stack. These interfaces will be defined by different physical parameters. Depending on the test program these physical parameters can be either of input nature (TIP) or of output nature (TOP) (see Table 1). Test environment TTP A Test Object: Cell V TBP negative electrode gas out negative electrode gas in positive electrode gas in positive electrode gas out f, T, p, x f, T, p, x f, T, p, x f, T, p, x VCell I TOven F Figure 4: Interfaces between SOC cell and test environment Test environment Test object: SOC Stack V V A V V negative electrode gas out negative electrode gas in positive electrode gas in positive electrode gas out TBP TTP f, T, p, x f, T, p, x f, T, p, x f, T, p, x V1 V2 V Stack ... I VN TOven F Figure 5: Interfaces between SOC stack and test environment For the reactants at cell/stack inlet and/or outlet these parameters are:  Temperature,T  Flow (mass or volume),f  Pressure,p  Gas composition,x The electric interface parameters are:  Cell/stack current (common synonym is stack load), I  Stack voltage, Vstack  Voltages of cell or the individual repeating units, Vcell or VRU,i The heat interface parameters are:  Oven temperature, Toven  Stack top plate temperature, TTP  Stack bottom plate temperature, TBP  Cell or stack internal temperature Tcell or Tstack,intern Considering the fact that a temperature gradient in the stack is unavoidable and depends on various factors such as gas flow rates, current, thermal exchange rate with the furnace, it is difficult to determine the stack temperature. In practice, depending on the stack design, temperature sensors mounted at different locations in or around the stack (e.g., in endplates, in gas inlet/outlet channels, or just in close proximity to the stack) can be used to estimate the stack temperature. It is however important to identify the one that represents the best the real stack temperature. In order to make results comparable among ...
AutoNDA by SimpleDocs

Related to Interface between test object and test environment

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Drug Test Results 1. All records pertaining to department-required drug tests shall remain confidential, and shall not be provided to other employers or agencies without the written permission of the person whose records are sought. However, medical, administrative, and immediate supervisory personnel may have access to relevant portions of the records as necessary to insure the acceptable performance of the officer's job duties.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Problem Solving Employees and supervisors are encouraged to attempt to resolve on an informal basis, at the earliest opportunity, a problem that could lead to a grievance. If the matter is not resolved by informal discussion, or a problem-solving meeting does not occur, it may be settled in accordance with the grievance procedure. Unless mutually agreed between the Employer and the Union problem-solving discussions shall not extend the deadlines for filing a grievance. The Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, either with the employee or alone, shall present to the appropriate supervisor a written request for a meeting. If the supervisor agrees to a problem- solving meeting, this meeting shall be held within fourteen (14) calendar days of receipt of the request. The supervisor, employee, Union Xxxxxxx, and up to one (1) other management person shall attempt to resolve the problem through direct and forthright communication. If another member of management is present that person will not be hearing the grievance at Step Two, should it progress to that Step. The employee, the Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, may participate in problem-solving activities on paid time, in accordance with Article 31, Union Rights, Section 1H.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!