Isolation Device Sample Clauses

Isolation Device. Member shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative’s electric system and Member’s Generator. The Isolation Device shall be installed as specified in the Interconnection Standard.
AutoNDA by SimpleDocs
Isolation Device. An Isolation Device as defined in Section 3.6 is required. The Cooperative in its sole discretion determines if the device is suitable.
Isolation Device. A manual load-break disconnect switch or safety switch with a clear visible indication of switch position between the Area EPS and the Generator. The switch must have pad lock provisions for locking in the open position. The switch must be visible to, and accessible to Cooperative personnel. The switch must be in close proximity, and visible from, the Member’s point of electrical interconnection with the Cooperative’s Area EPS. The switch must be labeled “Generator Disconnect Switch”. The switch may isolate the Generator system and its associated load from the area EPS or disconnect only the Generator from the Area EPS. The Cooperative shall have access to the Isolation Device at all times.
Isolation Device. Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between the City's electric system and Customer's Generator. The Isolation Device shall be installed as specified in the Interconnection Standard.
Isolation Device. The EDC shall have access to the Isolation Device of the Facility at all times. Generator is responsible for obtaining any and all property rights, including easements, which will permit the EDC access to such Isolation Device.
Isolation Device. Owner/Operator shall install a manual load-break disconnect switch with a clear visible indication of switch position between BEMC's electric system and Owner/Operator's Generator. The Isolation Device shall be installed and maintained as specified in the applicable engineering standards. The Owner/Operator shall adhere to any disconnect order or actual disconnect and shall not attempt to re-engage without obtaining BEMC’s authorized consent.
Isolation Device. Interconnection Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative's electric system and Interconnection Customer's Generator. The Isolation Device shall be installed as specified in the applicable engineering standards.
AutoNDA by SimpleDocs
Isolation Device. Member shall install an externally mounted lockable manual load-break disconnect switch with a clear visible indication of switch position providing disconnecting means between Cooperative’s electric system and Member’s Solar System. Isolation Device must remain operable by Cooperative’s personnel. Location of the Isolation Device must be approved by Cooperative prior to installation by Member.
Isolation Device. Member shall install a manual load-break disconnect switch with a clear visible indication of switch position between Company's electric system and Member's Generator. It is preferred the Isolation Device be within five feet (5’) of the meter base; otherwise there shall be signage clearly referencing location of the Isolation Device. The Isolation Device shall be installed as specified in the Interconnection Standard.
Isolation Device. A manual load-break disconnect switch or safety switch with a clear visible indication of switch position between the CES and the Distributed Resource. The switch must have pad lock provisions for locking in the open position. The switch must be visible to, and accessible to Cooperative personnel. The switch must be in close proximity, and visible from, the Member’s point of common coupling with the CES. The switch must be labeled “Generator Disconnect Switch”. The switch may isolate the Distributed Resource system and its associated load from the CES or disconnect only the Distributed Resource from the CES. The Cooperative shall have access to the Isolation Device at all times.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!