KILOMETER BETWEEN PLANT Sample Clauses

KILOMETER BETWEEN PLANT. RELOCATION ALLOWANCE 0 – 40 Nil 41 – 159 $ 700.00 160 – 481 $ 825.00 482 – 803 $ 950.00 804 – 1607 $1075.00
AutoNDA by SimpleDocs

Related to KILOMETER BETWEEN PLANT

  • Rest Between Shifts Section 7.10 of the Agreement shall apply in its entirety with the sole exception being that the length of the rest period shall be eight (8) hours rather than eleven (11) hours.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Disputes between a Contracting Party and an Investor of the other Contracting Party

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Time Off Between Shifts Failure to provide the minimum number of hours between the commencement of an employee's scheduled shift and the commencement of such employee's next scheduled shift shall result in payment of one and one-half (1½) times the employee's regular straight time hourly rate for only those hours which reduce the minimum hour period. Where the minimum period is reduced as a result of an approved change of shift(s) requested by the employee(s), such premium payment shall not apply. The minimum number of hours for purposes of this Article shall be determined locally and will be set out in the Local Provisions Appendix.

  • Disputes between the contracting parties

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Skilled Care in a Nursing Facility This plan covers skilled nursing services in a skilled nursing facility if: • the services are prescribed by a physician: • your condition needs skilled nursing services, skilled rehabilitation services or skilled nursing observation; • the services are provided by or supervised by licensed technical or professional medical personnel; and • the services are not custodial care, respite care, day care, or for the purpose of assisting with activities of daily living.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

Time is Money Join Law Insider Premium to draft better contracts faster.