LANDING AND/OR TRANSHIPMENT Sample Clauses

LANDING AND/OR TRANSHIPMENT. 1. The designated port for landing and/or transhipment activities in Seychelles by ASSOCIATION fishing vessels under the Agreement is Port Victoria, Mahé. 2. ASSOCIATION fishing vessels landing and/or transhipping catches in Port Victoria shall notify the competent Seychelles authorities at least 24 hours in advance of the start of the operation, or 72 hours prior to the vessels expected time of arrival in Port Victoria. The notification shall be sent electronically, and shall be submitted together with a pre-landing and/or pre-transhipment declaration which shall include the total amount of tuna and bycatch to be landed and/or transhipped as provided in the form prescribed in Appendix 4. 3. ASSOCIATION fishing vessels landing and/or transhipping catches in Port Victoria shall allow and facilitate the scientific sampling and/or inspection of such operations by officers of the competent Seychelles authorities. Upon completion of such inspection, an inspection report shall be provided to the master of the vessel, which shall be signed by the head of the inspection team and the master. 4. The competent Seychelles authorities may require that an ASSOCIATION fishing vessel delays the landing and/or transhipment of its catch while in Port Victoria, in the event of a suspected infringement of the Agreement or the laws of Seychelles. 5. No later than 48 hours of completion of landing /and or transshipment, or before leaving port, whichever happens first, the master of ASSOCIATION fishing vessel shall complete and submit a final landing /and or transshipment declaration to the competent Seychelles authorities in accordance with Appendix 5 with a maximum margin of error of +/-10% per species of the pre-declaration submitted in paragraph 2.
AutoNDA by SimpleDocs

Related to LANDING AND/OR TRANSHIPMENT

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures. 5.2.2 When One-Way or Two-Way Interconnection Trunks are provisioned using a DS3 interface facility, if Onvoy orders the multiplexed DS3 facilities to a Frontier Central Office that is not designated in the NECA 4 Tariff as the appropriate Intermediate Hub location (i.e., the Intermediate Hub location in the appropriate Tandem subtending area based on the LERG), and the provision of such facilities to the subject Central Office is technically feasible, the Parties shall negotiate in good faith reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures. 5.2.3 Each Party will identify its Carrier Identification Code, a three or four digit numeric code obtained from Telcordia, to the other Party when ordering a trunk group. 5.2.4 For multi-frequency (MF) signaling each Party will out pulse ten (10) digits to the other Party, unless the Parties mutually agree otherwise. 5.2.5 Each Party will use commercially reasonable efforts to monitor trunk groups under its control and to augment those groups using generally accepted trunk- engineering standards so as to not exceed blocking objectives. Each Party agrees to use modular trunk-engineering techniques for trunks subject to this Attachment.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Information and Services Required of the Owner The Owner shall provide information with reasonable promptness, regarding requirements for and limitations on the Project, including a written program which shall set forth the Owner’s objectives, constraints, and criteria, including schedule, space requirements and relationships, flexibility and expandability, special equipment, systems, sustainability and site requirements.

  • Technical and Organizational Measures The following sections define SAP’s current technical and organizational measures. SAP may change these at any time without notice so long as it maintains a comparable or better level of security. Individual measures may be replaced by new measures that serve the same purpose without diminishing the security level protecting Personal Data.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.

  • Community Engagement Integration Activities The SP will support the HSP to engage the community of diverse persons and entities in the area where it provides health services when setting priorities for the delivery of health services and when developing plans for submission to the LHIN including but not limited to CAPS and integration proposals.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Processing Transactions 2 2.1 Timely Pricing and Orders.................................... 2 2.2

  • Coffee Breaks The Company will provide two (2) fifteen (15) minute coffee breaks during each work day, one in the morning and one in the afternoon.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!