Lognormal Fading Sample Clauses

Lognormal Fading. This is an another mathematical distribution function (similar to Gaussian and Rayleigh) often used to describe stochastic processes. In a coverage test, the analytical model for describing the process is relegated to a secondary consideration, since the actual measured data would govern the results and the pass/fail criteria. Fading that assumes lognormal distribution would be tested in the same manner as Rayleigh fading for moving vehicles.
AutoNDA by SimpleDocs

Related to Lognormal Fading

  • Tolerance Average net mass of cement packed in bags in a sample shall be equal to or more than 50kg. If and as desired by the Engineer-in-Charge, the number of samples to be checked for net mass of cement per bag, in a given number of bags shall be as given below: 100 to 150 bags : 20 sample 150 to 280 bags : 32 sample 281 to 500 bags : 50 sample 501 to 1200 bags : 80 sample 1201 to 3200 bags : 125 sample 3201 and above : 200 sample The bags in a sample shall be selected at random.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Tolerances The maximum tolerances within concrete work shall be constructed are as follows:-

  • BRAND NAME OR EQUALS/DEVIATIONS Unless otherwise specified, the mention of a particular manufacturer’s brand name or number in the specifications does not imply that this particular good is the only one that will be considered for purchase. This reference is intended solely to designate the type or quality of good that will be acceptable. Equal offers will be considered and must include descriptive literature and/or specifications. Failure to provide descriptive literature and/or specifications with equal offers will result in the disqualification of the bid. The determination as to whether any alternate good or service is or is not equal shall be made solely by the County and such determination shall be final and binding upon all bidders. The County reserves the right to request and review additional information to make such a determination. Although the County provides for the consideration of alternate bids, it reserves the right to make an award in the best interest of the County. Award may not necessarily be given to the lowest bid offered. The Bidder shall be responsible for reading very carefully, and understanding completely, the requirements and the specifications of the items bid upon. Unless the bid is in response to a “Brand Name or Equal” requirement, deviations from the specifications will only be considered if requested in writing prior to the date and time specified for receipt of bids. Deviations, if accepted, will be specifically addressed in writing via an addendum to this Invitation for Bids. Any goods or services that are not in compliance with the specifications will not be accepted.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!