Measuring Station Sample Clauses

Measuring Station. BAMAGAS or the appropriate upstream transporter will install, own and operate, at the Point(s) of Receipt and the Point(s) of Delivery, a measuring station properly equipped with meters and other necessary measuring equipment by which the quantity of Natural Gas delivered under this Agreement shall be measured. Orifice meters or other AGA approved measurement devices, which include turbine or ultrasonic meters, shall be installed, operated and equipped with electronic flow measurement equipment in accordance with the latest applicable Measurement Committee Report of the American Gas Association. Nothing hereinabove shall preclude BAMAGAS or CES, at such Party’s sole cost, risk and expense, from installing, owning, operating and maintaining measuring equipment at or near the Point(s) of Receipt or Point(s) of Delivery to measure Natural Gas delivered under this Agreement. Each BAMAGAS and CES agree to grant each other a right to enter onto such Party’s property for the purpose of installing, reading and maintaining measuring equipment as provided for herein.
AutoNDA by SimpleDocs

Related to Measuring Station

  • Cost of Metering The Issuer shall not be obligated to pay any costs associated with the routine metering duties set forth in this Section 2, including the costs of installing, replacing and maintaining meters, nor shall the Issuer be entitled to any credit against the Servicing Fee for any cost savings realized by the Servicer as a result of new metering and/or billing technologies.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Measurement All quantities of Products received or delivered by or into truck, rail, or marine vessel shall be measured and determined based upon the meter readings at each Terminal, as reflected by delivery tickets or bills of lading, or if such meters are unavailable, by applicable calibration tables. All quantities of Products received and delivered by pipeline shall be measured and determined based upon the meter readings of the pipeline operator, as reflected by delivery tickets, or if such meters are unavailable, by applicable calibration tables. Deliveries to a Terminal rack at Mandan, Salt Lake City or Wilmington from a Tesoro Refinery shall be deemed to be the same as the corresponding volumes delivered contemporaneously from the Terminal rack. Deliveries by book transfer shall be reflected by entries in the books of TLO. All quantities shall be adjusted to net gallons at 60° F in accordance with ASTM D-1250 Petroleum Measurement Tables, or latest revisions thereof. A barrel shall consist of 42 U.S. gallons and a gallon shall contain 231 cubic inches. Meters and temperature probes shall be calibrated according to applicable API standards. Tesoro shall have the right, at its sole expense, and in accordance with rack location procedure, to independently certify said calibration. Storage tank gauging shall be performed by TLO’s personnel. TLO’s gauging shall be deemed accurate unless challenged by an independent certified xxxxxx. Tesoro may perform joint gauging at its sole expense with TLO’s personnel at the time of delivery or receipt of Product, to verify the amount involved. If Tesoro should request an independent xxxxxx, such xxxxxx must be acceptable to TLO, and such gauging shall be at Tesoro’s sole expense.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.

Time is Money Join Law Insider Premium to draft better contracts faster.