Metering Power and Communications Requirements Sample Clauses

Metering Power and Communications Requirements i. Revenue meters, ancillary equipment and communications equipment will be provided with 120 A.C. and 125v D.C. auxiliary power from the LIPA 8ER Brookhaven Substation control house.
AutoNDA by SimpleDocs

Related to Metering Power and Communications Requirements

  • Technical and Interconnection Requirements 2.1 Consumer agrees that his Rooftop Solar PV System and Net Metering System will conform to the standards and requirements specified in the Policy, Regulations and Supply Code as amended from time to time.

  • Hazard Communication Contractor will notify University prior to using products containing hazardous chemicals to which University employees may be exposed. Products containing hazardous chemicals are those products defined by Oregon Administrative Rules, Chapter 437. Upon University's request, Contractor will immediately provide Material Safety Data Sheets, as required by OAR Chapter 437, for the products subject to this provision.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing Ymax traffic to Verizon, the subtending arrangements between Verizon Tandems and Verizon End Offices shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to Ymax, the subtending arrangements between Ymax Tandems and Ymax End Offices shall be the same as the Tandem/End Office subtending arrangements that Ymax maintains for the routing of its own or other carriers’ traffic.

  • Interface Requirements 9.3.1 BellSouth shall offer LIDB in accordance with the requirements of this subsection.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Communications Protocol The Parties agree to be bound by the terms and conditions of the communications protocol provided for in Schedule “G” (Communications Protocol).

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate, and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter check socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!