Mining and Reclamation Sample Clauses

Mining and Reclamation. The approved mining and reclamation plan referred to in this contract is the Anarraaq and Aktigiruq Exploration Program, Phase I Plan of Operations (Plan of Operations), Approval No. F20229339. All mining and reclamation under this contract will comply with this Plan of Operations. Should there be any conflicts between the terms of this contract and the Plan of Operations, the Plan of Operations shall control.
AutoNDA by SimpleDocs
Mining and Reclamation. The Firestone Pit is to be developed as result of mining operations conducted by Seller on the Property pursuant to Permit No. M-1996-052 issued by the Colorado Mined Land Reclamation Board, as amended or reissued, including any reclamation plans (the “Mining Permit”). Seller’s mining and reclamation operations will continue after Closing subject to the terms of the Mining Lease. In accordance with the terms and conditions of this Agreement, Seller shall complete the mining and reclamation within the Firestone Pit consistent with the Mining Lease, Mining Permit and any related reclamation plan and deliver all required usable storage space within the same to Buyer along with a compacted xxxx xxxx liner or other impervious liner that meets the “State Engineer’s standards contained in the “State Engineer Guidelines for Lining Criteria for Gravel Pits August 1999” by December 31, 2031, specifically excluding achieving Final Growth on the Property as required by the reclamation plan. Seller shall remain responsible for the timely completion of reclamation obligations required by this Agreement and Seller’s Mining Permit, including but not limited to any revegetation or slope modification; Buyer shall bear no responsibility for any costs, effort or undertaking necessary to release of the Mining Permit except as otherwise agreed to by the Parties. All reclamation activities shall be consistent with Buyer’s anticipated use of the Firestone Pit as a water storage reservoir. Subject to the terms of this Agreement, nothing in the Mining Lease shall be interpreted to preclude Seller from excavating in excess of 5,400 acre feet from within the Firestone Pit within the term of this Mining Lease. Seller shall have no rights under the Mining Lease to mine any sand, aggregate or gravel on the Property outside of the Firestone Pit.

Related to Mining and Reclamation

  • Mining and Industrial Cooperation 1. The aims of cooperation in mining and industry sectors, carried out in the mutual interest of the Parties and in compliance with their policies, will be: (a) to focus cooperative activities towards sectors where mutual and complementary interests exist; and (b) to build on existing agreements and arrangements already in place between the Parties. 2. Mining and Industrial cooperation may include work in, but not be limited to, the following areas: (a) bio-mining (mining using biotechnology procedures); (b) mining techniques, specially underground mining, and conventional metallurgy; (c) productivity in mining; (d) industrial robotics for mining and other sector applications; (e) informatics and telecommunication applications for mining and industrial plant production; and (f) software development for mining and industrial applications. 3. The Parties will encourage and facilitate, as appropriate, the following activities including, but not limited to: (a) exchange of information, documentation and institutional contacts in areas of interest; (b) mutual access to academic, industrial and entrepreneurial networks in the area of mining and industry; (c) identification of strategies, in consultation with universities and research centres, that encourage joint postgraduate studies, research visits and joint research projects; (d) exchange of scientists, researchers and technical experts; (e) promotion of public/private sector partnerships and joint ventures in the support of the development of innovative products and services specially related to productivity in the sector activities; (f) technology transfer in the areas mentioned in paragraph 2; (g) designing of innovation technology models based in public/private cooperation and association ventures; and (h) information and experience exchange on mining environmental issues.

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

  • MINES The Contractor represents and warrants that neither it, its parent entities (if any), nor any of the Contractor’s subsidiaries or affiliated entities (if any) is engaged in the sale or manufacture of anti-personnel mines or components utilized in the manufacture of anti-personnel mines.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. Purchaser may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net scale in percentage of gross scale, or based on the merchantability factor, whichever is stated in A2. If necessary to assess extent of defect, Purchaser shall make sample saw cuts or wedges. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • CONTRACTOR’S SUPERINTENDENCE Add the following at the end of the first paragraph of sub-clause 15.1: “The Contractor shall, within Fourteen (14) days of receipt of the Engineer’s order to commence the works inform the Engineer in writing the name of the Contractor’s Representative and the anticipated date of his arrival on site. The Contractor shall also submit a specimen signature of his proposed Site Agent /Road Manager who SHALL be the only signatory to payment of certificates/Monthly statements from the Contractor. Add the following Sub-clause 15.2 ‘SUBCLAUSE 15.2- LANGUAGE ABILITY AND QUALIFICATIONS OF CONTRACTOR’S AUTHORISED AGENT Unless otherwise stated in the tender document, the Contractor’s Agent or Representative on the site shall have a minimum qualification of a Registered Professional Engineer (Highways) and shall be able to read and write English fluently. The Contractor’s Agent or Representative shall have at least 5 years relevant experience as a Site Agent.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

Time is Money Join Law Insider Premium to draft better contracts faster.