Study Population Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months post enterostomy closure, following enterostomy closure (12-month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 month of overall study duration).
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that: 10.1.2.1.6.1 Ensures construction documents are well coordinated and reviewed for errors; 10.1.2.1.6.2 Identifies to the extent known, construction deficiencies and areas of concern; 10.1.2.1.6.3 Back-checks design drawings for inclusion of modifications; and 10.1.2.1.6.4 Provides the District with written confirmation that: 10.1.2.1.6.4.1 Requirements noted in the design documents prepared for the Project are consistent with and conform to the District's Project requirements and design standards. 10.1.2.1.6.4.2 Various components have been coordinated and are consistent with each other so as to minimize conflicts within or between components of the design documents.
Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Modernization Process Measure:
Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term. B. The following articles apply to ASEs who are employed in the summer session: Recognition, Wages (range adjustment only), DCP, Travel, Health and Safety, Leaves, Holidays, Duration, Workspace and Instructional Support, Parking, Grievance and Arbitration, Waiver, Management and Academic Rights, No Strikes, Non-Discrimination, Union Access and Rights, Union Security, Discipline and Dismissal, Emergency Layoff, Employment Files and Evaluations, Definitions, Severability, Labor-Management Meetings, and Classifications. C. The remainder of the articles in the agreement does not apply to ASEs who are employed in the summer session. D. The topic of Summer Session, and effects of changes on terms and conditions of employment for ASEs employed in Summer Session, shall be reopened for bargaining commencing no later than January 2, 2001.
Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.
Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.
Low Census Low census is defined as a decline in patient care requirements resulting in a temporary staff decrease. During temporary periods of low census, the Employer will 1. Send home Agency nurses. 2. Cancel Overtime shifts. 3. Cancel incentive shifts. 4. Ask for volunteers. 5. Cancel reserve nurses. 6. Cancel part-time nurses working above their assigned FTE.