Operational Safety on Airports During Construction. The Engineer shall review to ensure that all applicable construction safety items are addressed and meet the requirements of AC 150/5370-2 (Current Edition) and the Contract’s Construction Safety and Phasing Plan (CSPP). The intent of the SPCD is to detail how the Contractor will comply with the CSPP. Following award of the project to the successful Contractor and prior to the issuance of the Notice to Proceed, the Engineer will review the SPCD, provide comments and ultimately approval of the document. It is anticipated that the document will require at least one re-submittal by the Contractor to address any missing information. The SPCD will be submitted to the Engineer for approval at least 14 days prior to the issuance of the Notice to Proceed to the Contractor. An approved copy of the SPCD shall be provided to the FAA.
AutoNDA by SimpleDocs
Operational Safety on Airports During Construction. A construction phasing plan that meets the requirements of the AC and operational needs of the airport will be developed and included in the Contract Documents. This plan will also identify any nighttime work, continuous working times, or other unusual conditions that could affect the Contractor’s normal progress on the project. The draft CSPP will be submitted at 30% complete and at 95% complete for ADO review. Upon preliminary approval from the ADO, the CSPP will be submitted to FAA for OE/AAA coordination.
Operational Safety on Airports During Construction. Also included in the Contract Documents, and covered under separate tasks below, are the Technical Specifications and Special Provision. Preliminary Contract Documents will be prepared as early as possible during the design phase and submitted to the Sponsor for review.
Operational Safety on Airports During Construction a. The contract documents will include but not limited to: • Ad for Bid • Instructions to BiddersBid Form • Non-Segregated FacilitiesDBE RequirementsBuy American Guidance • CSPP and SPCD Documents • Notice of AwardContract AgreementPerformance and Payment Bonds • FAA General ProvisionsSpecial ProvisionsInsurance Requirements • FAA Required Contract Provisions • FAA Construction Safety Advisory Circular • Federal Wage Rate RequirementsTechnical Specifications • Final Review and AcceptanceEnvironmental Permitting

Related to Operational Safety on Airports During Construction

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Maintenance during Construction Period (i) During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition on Appointed Date, and shall undertake the necessary repair and maintenance works for this purpose; provided that the Contractor may, at its cost, interrupt and divert the flow of traffic if such interruption and diversion is necessary for the efficient progress of Works and conforms to Good Industry Practice; provided further that such interruption and diversion shall be undertaken by the Contractor only with the prior written approval of the Authority’s Engineer which approval shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at all times be responsible for ensuring safe operation of the Project Highway. It is further agreed that in the event the Project includes construction of a bypass or tunnel and realignment of the existing carriageway, the Contractor shall maintain the existing highway in such sections until the new Works are open to traffic.

  • Application of General Conditions These General Conditions set forth the terms and conditions generally applicable to the Development Grant Agreement to the extent and subject to any modifications set forth in such agreement.”