Construction Safety and Phasing Plan Sample Clauses

Construction Safety and Phasing Plan. 3.5.1. Garver will develop a construction safety and phasing plan (CSPP) for the project. During development of the CSPP, Garver will hold a meeting with Airport staff and other stakeholders at the Airport’s request to obtain feedback regarding operations during each proposed phase of construction. 3.5.2. After receiving comments from the meeting, Garver will develop a preliminary CSPP for the Owner’s review prior to submission to the FAA. After incorporating Owner comments, the CSPP will be submitted to FAA for review through the OE/AAA website.
AutoNDA by SimpleDocs
Construction Safety and Phasing Plan. (CSPP) The overall plan for safety and phasing of a construction project developed by the airport operator, or developed by the airport operator’s consultant and approved by the airport operator. It is included in the invitation for bids and becomes part of the project specifications.
Construction Safety and Phasing Plan. (CSPP) – AVCON will prepare the final CSPP. AVCON will coordinate the project construction phasing and sequencing plan with the Authority and affected stakeholders. This document will supplement the technical specifications and serve as a guide for the selected Contractor when preparing the Safety Plan Compliance Document (SPCD).
Construction Safety and Phasing Plan. The Design Builder will prepare a project specific Construction Safety and Phasing Plan (CSPP) and submit to the Authority for review.
Construction Safety and Phasing Plan. Xxxxxx will develop a construction safety and phasing plan (CSPP) for the project. During development of the CSPP, Xxxxxx will hold a meeting with Airport staff and other stakeholders at the Airport’s request to obtain feedback regarding operations during each proposed phase of construction. After receiving comments from the meeting, Xxxxxx will develop a preliminary CSPP for the Client’s review prior to submission to the FAA. After incorporating Client comments, the CSPP will be submitted to FAA for review.

Related to Construction Safety and Phasing Plan

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Health and Safety Plan Consultant shall prepare and submit a Health and Safety Plan (“HASP”) for the portion of Consultant’s work that will involve field work, assessments, or investigations of certain Project elements. The HASP shall describe how Consultant plans to complete field work, assessments, and/or investigations at the RWF. Consultant’s HASP must comply with the CIP HASP and shall be updated as new conditions are encountered.

  • Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.

  • Contract Work Hours and Safety Standards Act The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards.

  • Work Health and Safety (a) The employer and employee acknowledge their responsibilities under the Work Health and Safety Act 2011 and Work Health and Safety Regulations 2012. (b) Where there is a Work Health and Safety Representative they must be elected and will carry out the tasks associated with the role of Work Health and Safety Representative set out within the Work Health and Safety Act 2011.

  • Construction Standards The Developer shall construct the Subdivision in accordance with the Subdivision Plan, as approved by the Planning Commission, and if applicable, the requirements of the Design Review Committee, and in accordance with the requirements of (a) the Millington Subdivision Regulations; (b) standards and specifications contained in “Local Public Works Standard, and Specifications”, as amended to include specific requirements for construction in Millington, TN; (c) the Building Code (as adopted by Shelby County); (d) the Fire Code (as adopted by Shelby County); (e) the Millington Zoning Ordinance; and (f) the applicable Ordinances of the City. Items (a) through (f) are hereby made a part of this Agreement by reference and are hereinafter referred to collectively as the “Codes”. References herein to the Codes are to those in effect on the Effective Date unless amendments are hereafter made which apply to all improvements or subdivisions regardless of their date of commencement and/or completion of construction. The Conditions of Approval established by the Planning Commission, and, as applicable, the Design Review Committee (any or all of which as may have been modified by the Board of Mayor and Aldermen) are set forth in Exhibit “A” to this Agreement and are incorporated herein by reference and made a part hereof.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.