Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.
PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $200,000 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $0 - OWDA $0 - CDBG $0 - Other $0 v) OPWC Funds: - Loan Assistance $0
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.
Utility Easements There is hereby reserved for the use and benefit of the Association and all Owners, non-exclusive easements within the Common Areas for the location, installation and maintenance of utilities and drainage facilities of convenience or necessity as may be requested or required by the Association or any Owner provided that the grant thereof does not unreasonably interfere with the normal operation, improvement, and use of the Common Area and the buildings constructed within the Center, and no affirmative monetary obligation is imposed upon the Owners (other than the Owner benefiting from such easement). The Declarant (and the Board where there no longer is a Declarant) shall have the authority to grant easements or rights-of-way for utilities over the Common Areas as necessary to serve the Common Areas and/or the Parcels. The Owner of any Parcel and any of his Occupants or licensees shall have the right at all reasonable times to enter upon the land subject to said easements and to install, maintain, operate, repair and service utilities and drainage facilities thereon for the use and benefit of his Parcel; provided, however, any such Person shall restore said land, at his own expense, as nearly as practicable, to the same condition as existed prior to such entry and shall comply with the provisions of Section 11.6. The Owner of any Parcel shall have the right to assign the benefit and use of any such easement to any public or private utility company, agency or district for the purpose of installing, operating, repairing, servicing and maintaining utilities or drainage facilities and enforcing the easement rights. For purposes hereof, "utilities" shall include electricity, gas mains and lines, water distribution lines, storm water sewers, sanitary sewers, telephone, fiberoptic, cable TV, and telegraph cables and lines, and other similar or related facilities commonly regarded as utilities. All storm drains, utility lines, transformers and meters shall be maintained under the terms of this Declaration in a safe and good working condition by the party responsible therefor. No grantee of a utility easement shall in the use, construction, reconstruction, operation, maintenance or repair of any storm drains, utility lines, transformers and meters in any way interfere, obstruct or delay the business of the grantor of said easement or any other Owner or Occupant, or the public access to and from said business or interfere, obstruct or delay in any way the receiving of merchandise by said grantor or any Owner or Occupant. EXHIBIT F -35- PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.
Project Site The “Project Site” is the place where the Work is being carried on.