PADLOCK AND KEYS Sample Clauses

PADLOCK AND KEYS. Xxxxxx agrees to lease an RTD issued padlock and two (2) keys to be used on the assigned locker. Xxxxxx agrees to use the RTD issued padlock on the locker at all times. Using a non-RTD issued padlock will be considered a violation of the Rental Agreement and will be removed by RTD at Renter’s expense. The padlock and keys are RTD's property. If padlock or keys are lost, the following fees apply for replacement: $50.00 - Padlock Replacement Fee (includes 2 new keys). RTD does not replace keys only - a new padlock is required. For padlock replacement requests, contact the RTD Bike Locker Program at 000-000-0000. Return of padlock and key deposit is described in paragraph 11(d) below.
AutoNDA by SimpleDocs

Related to PADLOCK AND KEYS

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

Time is Money Join Law Insider Premium to draft better contracts faster.