Point Range and Wage Curve Sample Clauses

Point Range and Wage Curve. The point range and wage curve for the twenty-eight (28) groups are as follows:
AutoNDA by SimpleDocs
Point Range and Wage Curve. The Plywood Job Evaluation wage curve is as follows: PLYWOOD JOB EVALUATION WAGE RANGE Rates Effective Grade Points July 1, 2010 July 1, 2011 July 1, 2012 1 0-81 24.435 24.925 25.425 2 82-91 24.60 25.09 25.59 3 92-101 24.76 25.26 25.77 4 102-111 24.92 25.42 25.93 5 112-121 25.16 25.66 26.17 6 122-131 25.32 25.83 26.35 7 132-141 25.60 26.11 26.63 8 142-151 25.81 26.33 26.86 9 152-161 26.05 26.57 27.10 10 162-171 26.27 26.80 27.34 11 172-181 26.54 27.07 27.61 12 182-191 26.73 27.26 27.81 13 192-201 27.00 27.54 28.09 14 202-211 27.27 27.82 28.38 15 212-221 27.49 28.04 28.60 16 222-231 27.80 28.36 28.93 17 232-241 28.08 28.64 29.21 18 242-251 28.37 28.94 29.52 19 252-261 28.61 29.18 29.76 20 262-271 29.00 29.58 30.17 21 272-281 29.43 30.02 30.62 22 282-291 29.73 30.32 30.93 23 292-301 30.12 30.72 31.33 24 302-311 30.52 31.13 31.75 25 312-321 30.86 31.48 32.11 26 322-331 31.23 31.85 32.49 27 332-341 31.59 32.22 32.86 Section 3: Red Circle Jobs Incumbents in job categories for which the wage rate is reduced as a result of job evaluation (hereinafter referred to as "red circle jobs") shall continue at the original rate.
Point Range and Wage Curve. The point range and wage curve for the twenty-eight (28) groups are as follows: SAWMILL JOB EVALUATION WAGE RANGE Rates Effective July 1, July 1, July 1, Grade Points 2010 2011 2012 1 1-60 24.435 24.925 25.425 2 61-70 24.56 25.05 25.55 3 71-80 24.68 25.17 25.67 4 81-95 24.83 25.33 25.84 5 96-115 24.98 25.48 25.99 6 116-140 25.17 25.67 26.18 7 141-165 25.32 25.83 26.35 8 166-195 25.60 26.11 26.63 9 196-230 25.81 26.33 26.86 10 231-270 26.05 26.57 27.10 11 271-320 26.28 26.81 27.35 12 321-370 26.57 27.10 27.64 13 371-420 26.80 27.34 27.89 14 421-470 27.10 27.64 28.19 15 471-520 27.35 27.90 28.46 16 521-570 27.72 28.27 28.84 17 571-620 27.95 28.51 29.08 18 621-670 28.29 28.86 29.44 19 671-730 28.53 29.10 29.68 20 731-790 28.90 29.48 30.07 21 791-850 29.17 29.75 30.35 22 851-910 29.54 30.13 30.73 23 911-970 29.92 30.52 31.13 24 971-1030 30.21 30.81 31.43 25 1031-1090 30.92 31.54 32.17 26 1091-1150 31.64 32.27 32.92 27 1151-1210 32.43 33.08 33.74 28 1211- 33.21 33.87 34.55 Section 3: Minimum Rate
Point Range and Wage Curve. The point range and wage curve for the twenty-eight (28) groups are as follows: SAWMILL JOB EVALUATION WAGE RANGE Effective Effective Effective Effective Effective Grade Points July 1, 2018 July 1, 2019 July 1, 2020 July 1, 2021 July 1, 2022 1 0-60 $29.490 $30.080 $30.680 $31.295 $32.075 2 61-70 $29.64 $30.23 $30.83 $31.45 $32.24 3 71-80 $29.76 $30.36 $30.97 $31.59 $32.38 4 81-95 $29.98 $30.58 $31.19 $31.81 $32.61 5 96-115 $30.14 $30.74 $31.35 $31.98 $32.78 0 000-000 $30.38 $30.99 $31.61 $32.24 $33.05 0 000-000 $30.55 $31.16 $31.78 $32.42 $33.23 0 000-000 $30.89 $31.51 $32.14 $32.78 $33.60 0 000-000 $31.15 $31.77 $32.41 $33.06 $33.89 00 000-000 $31.43 $32.06 $32.70 $33.35 $34.18 00 000-000 $31.72 $32.35 $33.00 $33.66 $34.50 00 000-000 $32.06 $32.70 $33.35 $34.02 $34.87 00 000-000 $32.33 $32.98 $33.64 $34.31 $35.17 00 000-000 $32.69 $33.34 $34.01 $34.69 $35.56 00 000-000 $33.01 $33.67 $34.34 $35.03 $35.91 00 000-000 $33.46 $34.13 $34.81 $35.51 $36.40 00 000-000 $33.71 $34.38 $35.07 $35.77 $36.66 00 000-000 $34.13 $34.81 $35.51 $36.22 $37.13 00 000-000 $34.41 $35.10 $35.80 $36.52 $37.43 00 000-000 $34.87 $35.57 $36.28 $37.01 $37.94 00 000-000 $35.21 $35.91 $36.63 $37.36 $38.29 00 000-000 $35.64 $36.35 $37.08 $37.82 $38.77 00 000-000 $36.10 $36.82 $37.56 $38.31 $39.27 00 000-0000 $36.45 $37.18 $37.92 $38.68 $39.65 00 0000-0000 $37.32 $38.07 $38.83 $39.61 $40.60 00 0000-0000 $38.18 $38.94 $39.72 $40.51 $41.52 00 0000-0000 $39.14 $39.92 $40.72 $41.53 $42.57 28 1211+ $40.07 $40.87 $41.69 $42.52 $43.58 Section 3: Minimum Rate
Point Range and Wage Curve. The Plywood Job Evaluation wage curve is as follows:

Related to Point Range and Wage Curve

  • Wire Unbundled DS1 Digital Loop This is a designed 4-wire Loop that is provisioned according to industry standards for DS1 or Primary Rate ISDN services and will come standard with a test point, OC, and a DLR. A DS1 Loop may be provisioned over a variety of loop transmission technologies including copper, HDSL-based technology or fiber optic transport systems. It will include a 4-Wire DS1 Network Interface at the End User’s location.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • -wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

Time is Money Join Law Insider Premium to draft better contracts faster.