Replacement of Parts Except as otherwise provided herein, so long as the Airframe or Engine is subject to the Lien of this Indenture, Owner, at its own cost and expense, will, or will cause a Permitted Lessee to, at its own cost and expense, promptly replace (or cause to be replaced) all Parts which may from time to time be incorporated or installed in or attached to the Aircraft, Airframe or any Engine and which may from time to time become worn out, lost, stolen, destroyed, seized, confiscated, damaged beyond repair or permanently rendered unfit for use for any reason whatsoever. In addition, Owner may, at its own cost and expense, or may permit a Permitted Lessee at its own cost and expense to, remove (or cause to be removed) in the ordinary course of maintenance, service, repair, overhaul or testing any Parts, whether or not worn out, lost, stolen, destroyed, seized, confiscated, damaged beyond repair or permanently rendered unfit for use; provided, however, that Owner, except as otherwise provided herein, at its own cost and expense, will, or will cause a Permitted Lessee at its own cost and expense to, replace such Parts as promptly as practicable. All replacement parts shall be free and clear of all Liens, except for Permitted Liens and pooling arrangements to the extent permitted by Section 4.04(c) below (and except in the case of replacement property temporarily installed on an emergency basis) and shall be in good operating condition and have a value and utility not less than the value and utility of the Parts replaced (assuming such replaced Parts were in the condition required hereunder).
Pooling of Parts Any Part removed from the Airframe or any Engine as provided in Section 7.04(a) may be subjected by the Company or a Person permitted to be in possession of the Aircraft to a pooling arrangement customary in the airline industry entered into in the ordinary course of the Company’s or such Person’s business; provided that the part replacing such removed Part shall be incorporated or installed in or attached to the Airframe or such Engine in accordance with Section 7.04(a) as promptly as practicable after the removal of such removed Part. In addition, any replacement Part when incorporated or installed in or attached to the Airframe or any Engine may be owned by any third party subject to such a pooling arrangement; provided that the Company, at its expense, as promptly thereafter as practicable, either (i) causes title to such replacement Part to vest in the Company free and clear of all Liens (except Permitted Liens), or (ii) replaces such replacement Part by incorporating or installing in or attaching to the Airframe or such Engine a further replacement Part in the manner contemplated by Section 7.04(a).
Replacement Parts Replacement parts for goods purchased by Buyer are for the purpose of this Section defined as “Parts” (and are also considered “goods” under this Order). Unless specified otherwise by Buyer in writing, Supplier shall provide Parts (or upon Buyer’s written consent, an alternative replacement part that provides the same form, fit and function as the Part(s)) for a period of twenty (20) years after production of the goods (into which the applicable Parts are incorporated) ceases. Supplier shall continue to supply such Parts past the twenty (20) year period if Buyer orders at least twenty (20) Parts per year during such twenty-year period. The prices for any Parts purchased in the first two (2) years of the twenty-year period shall not exceed those prices in effect at the time production of the goods ceases, and no set up charges shall be permitted by Supplier or paid by Xxxxx during this two-year period. Thereafter, the prices for Parts shall be negotiated based on Supplier’s actual cost of production of such Parts plus any special packaging costs. No minimum order requirements shall apply unless the parties mutually agree in advance. After the end of the twenty-year period, Supplier shall continue to maintain in good working condition all Supplier-owned tooling required to produce the Parts and shall not dispose of such tooling without offering Buyer the right of first refusal to purchase such tooling.
Replacement Parts Warranty If during the regular or extended warranty period’s faults develop, the Contractor shall promptly repair or, upon demand, replace the defective unit or component part affected. All costs for labor and material and transportation incurred to repair or replace defective Product during the warranty period shall be borne solely by the Contractor, and the State or Authorized User shall in no event be liable or responsible therefor. Any part of component replaced by the Contractor under the Contract warranty shall be replaced at no cost to the Authorized User and guaranteed for the greater of: a) the warranty period under paragraph (d) above; or b) if a separate warranty for that part or component is generally offered by the manufacturer, the standard commercial warranty period offered by the manufacturer for the individual part or component.
Removal of parts The Borrower shall not remove any material part of the Ship, or any item of equipment installed on the Ship, unless the part or item so removed is forthwith replaced by a suitable part or item which is in the same condition as or better condition than the part or item removed, is free from any Security Interest or any right in favour of any person other than the Lender and becomes on installation on the Ship the property of the Borrower and subject to the security constituted by the Mortgage Provided that the Borrower may install equipment owned by a third party if the equipment can be removed without any risk of damage to the Ship.
Accessories, Spare Parts and Tools Accessories, spare parts and tools dispatched with a piece of equipment, machine, apparatus or vehicle, which are part of the normal equipment and included in the price thereof or which are not separately invoiced, shall be regarded as one with the piece of equipment, machine, apparatus or vehicle in question.
Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.
Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.
Substitution of Key Personnel Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City. The key personnel for performance of this Agreement are as follows: Xxxxx Xxxxx.