Positions Vacated Sample Clauses

Positions Vacated. When the Employer has been notified, in writing, that a temporary vacancy in a permanent posted position will have a duration of sixty (60) days or more, the Employer will post the temporary vacancy from the onset of the absence for the duration of the expected leave. The vacancy shall be filled pursuant to Article 12.1.
AutoNDA by SimpleDocs

Related to Positions Vacated

  • Positions Temporarily Vacant (a) The Employer agrees to make every reasonable effort to ensure that the workloads of employees will not be unnecessarily increased as a result of positions temporarily vacant due to illness, vacation leave, in-service training, or any other reason.

  • VACANCIES AND NEW POSITIONS 17.01 The Gallery shall post notice of permanent and temporary job vacancies subject to Article 4 – Temporary Full-Time Employees for a period of seven (7) calendar days before any such job is filled. Probationary employees shall not be entitled to apply for posted vacancies. It is agreed that the Gallery will not interview external applicants until applications from existing employees have been reviewed and bargaining unit employees who are qualified in the opinion of the Gallery have been interviewed. Further, the Gallery will notify existing applicants in writing once the successful application is selected.

  • New Positions A. Each newly created position shall be assigned by the Employer to the national craft unit most appropriate for such position within thirty (30) days after its creation. Before such assignment of each new position the Employer shall consult with the Union for the purpose of assigning the new position to the national craft unit most appropriate for such position. The following criteria shall be used in making this determination:

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

  • Positions From and after the Effective Date, Company shall employ Executive in the position of Chief Executive Officer of Company, or in such other positions as the parties mutually may agree.

  • VACANCIES, TERM POSITIONS AND NEW POSITIONS 3001 Subject to section 3002 herein, the Employer agrees to post notices of vacant, term or new positions covered under this Agreement for at least seven (7) days to enable nurses presently in the employ of the Employer to apply for same. Such posting shall not preclude the Employer from advertising outside the site premises. All postings shall state minimum qualifications required, the equivalent to full-time (E.F.T.) and date of closing of the competition. Job descriptions shall be available to applicants on request. 3002 The Employer will be required to post a notice of vacancy for only five (5) days for a vacancy that is created by:

  • Safe Operations Notwithstanding any other provision of this Agreement, an NTO may take, or cause to be taken, such action with respect to the operation of its facilities as it deems necessary to maintain Safe Operations. To ensure Safe Operations, the local operating rules of the ITO(s) shall govern the connection and disconnection of generation with NTO transmission facilities. Safe Operations include the application and enforcement of rules, procedures and protocols that are intended to ensure the safety of personnel operating or performing work or tests on transmission facilities.

  • Position During the Term, the Employee shall serve as the Chief Executive Officer of the Company and in such other capacities as shall be designated by the Board of Directors of the Company (the “Board”) and agreed to by the Employee from time to time.

  • Replacement of Key Personnel The Engineer must notify the State in writing as soon as possible, but no later than three business days after a project manager or other key personnel is removed from association with this contract, giving the reason for removal.

  • New Position An approved position not reflected in the current year budget complement.

Time is Money Join Law Insider Premium to draft better contracts faster.