(Post-Production Project Team AFEs) Sample Clauses

(Post-Production Project Team AFEs). 2.59Producible Reservoir An underground accumulation of Hydrocarbons (a) separate from and not in Hydrocarbon communication with another accumulation of Hydrocarbons, and (b) into which a Producible Well has been drilled.
AutoNDA by SimpleDocs
(Post-Production Project Team AFEs). The Execution Stage concludes upon the first production of Hydrocarbons from the Development System. At least sixty (60) days, but not more than one hundred twenty (120) days, prior to the first production of Hydrocarbons from the Development System, the Operator may propose for approval by Vote of the continuance of the Project Team, if one exists, on such smaller scale, which is reasonable considering the scope of the work involved or the formation of the Project Team, if one does not exist, in order to assist the Operator in the drilling of additional Development Xxxxx approved by the Parties, de-bottlenecking the Development System, ramping up Hydrocarbon production, maximizing the recovery of Hydrocarbons during the Development Phase and activities related thereto. With its proposal, the Operator shall include an initial Post-Production Project Team AFE accompanied by a memorandum similar to the one described in Article 12.3.1
(Post-Production Project Team AFEs). The Execution Stage concludes upon the first production of Hydrocarbons from the Development System. At least sixty (60) days, but not more than one hundred twenty (120) days, prior to the first production of Hydrocarbons from the Development System, the Operator may propose for approval by Vote of the continuance of the Project Team, if one exists, on such smaller scale, which is reasonable considering the scope of the work involved or the formation of the

Related to (Post-Production Project Team AFEs)

  • Joint Project Team As soon as possible after the Effective Date, the Parties shall establish a joint project team (the “JPT”) which shall be initially responsible for the day-to-day operations of the Initial Target Program. The JPT shall also be responsible for the day-to-day operations of all other Collaboration Programs when they become ***Portions of this page have been omitted pursuant to a request for Confidential Treatment and filed separately with the Commission. effective; provided, that if multiple JPTs are needed due to different Targets or disease areas, then the Parties may establish separate JPTs for different Collaboration Programs. The JPT shall be comprised of representatives from each of GSK and Adaptimmune with the appropriate scientific expertise with respect to the conduct of the Development Plans (and such representatives may vary depending on the relevant Project Phase) and shall meet on a monthly basis (or more or less frequently as agreed by the Parties) at Adaptimmune’s facilities, GSK’s facilities or via teleconference at such times as may be agreed by the Parties during the term of the applicable Collaboration Program. The JPT will report to the JSC and will be responsible for the day-to-day management of the conduct of the Development Plans including any non-material changes to the Development Plans, overseeing the conduct of experiments and reviewing data resulting from such experiments as set forth in the Development Plans, proposing amendments to the Development Plans, proposing new Development Plans to the JSC for new Collaboration Programs for JSC approval, discussing potential Lead Candidates and Development Candidates for proposal to the JSC. All decisions of the JPT on matters for which it has responsibility shall be made unanimously. In the event that the JPT is unable to reach a unanimous decision within ten (10) Business Days after it has met and attempted to reach such decision, then either Party may, by written notice to the other, have such issue submitted to the JSC for resolution in accordance with Section 4.5. Each Party will bear all expenses it incurs in regard to participating in all meetings of the JPT, including all travel and living expenses. Each JPT shall automatically cease to exist on completion of the relevant Collaboration Programs that it supports and exercise or expiry of all Collaboration Program Options applicable to such Collaboration Programs.

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • Production Work The Company may use Outside Entities to perform production work outside the plant and its environs provided the Company demonstrates that it is utilizing plant equipment to the maximum extent consistent with equipment capability and customer requirements and the Company is making necessary capital investments to remain competitive in the steel business and is in compliance with Article Eleven, Section B (Investment Commitment).

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Project Team To accomplish Owner’s objectives, Owner intends to employ a team concept in connection with the construction of the Project. The basic roles and general responsibilities of team members are set forth in general terms below but are more fully set forth in the Design Professional Contract with respect to the Design Professional, in the Program Management Agreement with any Program Manager, and in this Contract with respect to the Contractor.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Development Budget Attached hereto as Exhibit "B" and incorporated herein by this reference is the Development Budget in an amount equal to $_____________. Owner acknowledges and represents that the attached Development Budget includes the total costs and expenses to acquire, develop, renovate and construct the Real Property and the Apartment Housing.

  • Development Costs With respect to activities prior to the Amendment Effective Date, each Party was to pay [*] of the total Direct Development Costs of a Product incurred in accordance with the Development Budget (as defined in the Original Agreement). Notwithstanding anything in this Article 6 of this Agreement or in any other provision of this Agreement to the contrary, with respect to activities on and after the Amendment Effective Date, subject to Sections 3.1.2, Alimera will be solely responsible for, and shall pay one hundred percent (100%) of, all development costs of a Product, including Direct Development Costs. Notwithstanding anything in this Article 6 of this Agreement or in any other provision of this Agreement to the contrary, (i) all payments owing by CDS hereunder with respect to development activities prior to the Amendment Effective Date are hereby deemed fully paid by CDS (or waived, to the extent such waiver may be required), including any Development Payments, Compounded Development Payments, Determined Disputed Costs and Compounded Disputed Costs (as all defined in the Original Agreement), further including any penalties and interest which might have accrued with respect thereto, and further including all CDS payments deferred pursuant to that February 11, 2008 letter agreement sent by CDS and executed by CDS and Alimera regarding deferral of payments under the Original Agreement as of such date; (ii) all payments owing by Alimera hereunder with respect to development activities prior to the Amendment Effective Date are hereby deemed fully paid by Alimera (or waived, to the extent such waiver may be required), including any Development Payments, Compounded Development Payments, Determined Disputed Costs and Compounded Disputed Costs (as all defined in the Original Agreement), and further including any penalties and interest which might have accrued with respect thereto; and (iii) subject to Sections 3.1.1 and 3.1.2, from and after the Amendment Effective Date, CDS will have no liability whatsoever hereunder for any past, present or future development costs, including Direct Development Costs (which includes those incurred before, on and after the Amendment Effective Date), and instead Alimera shall have sole liability therefor.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

Time is Money Join Law Insider Premium to draft better contracts faster.