Power distance Sample Clauses

Power distance. ‌ PD could be a troublesome problem when the people with low PD go into a new circumstance with high PD. It does not only exist in bureaus and firms, but also in schools. In lower PD culture, people are more relaxed in a comfortable environment and harmonious atmosphere, which is good for employees to improve efficiency. However, in the high PD culture, the high power hierarchy gives people much pressures and lots of complains. Workers are depressed by limited channels of communication and spaces for their emotions, they have relatively low efficiency. since you can image that the voices of the bottom has to go through a long distance and can hardly reach to the high management, this process takes time and is with low efficiency. The opinions and ideas of the lower level cannot be reflected to the top and thus the workers would not be satisfied with the current situations. When it comes to universities and educational cooperation cross borders, the problems become more serious. In Norwegian society, the hierarchy structure is quite flat and power distance is very low. The reason behind this is that people in Norway have strong sense of equality and in the organizations, they have enough freedom to express their ideas and feelings. In the work places Norwegians are not satisfied with the imbalance of power distribution and hate to be ignored. Even the smallest individuals should be heard by others, the top of the management also would like to listen to the bottom and make changes when necessary. They also believe that flat organizational structure is good for management and with high efficiency. As a member of this society, UiN definitely has low hierarchy, the management, professors and students enjoy a very casual relations and get used to it. People within the school like the equal distribution of power, no one is superior to others and everyone has equal right to others directly. However, China is on another end of teeterboard, the PD is very high. This has much to do with China’s traditions and history. Since China had been feudal society for more than 2400 years, during that period, our ancestors had built sound feudal hierarchy which was vertical and high. Even the new China has changed a lot of that kind system, it still exists in every corner of society. Bureaucratism and sense of hierarchy are still rooted deeply in people’s mind. The distribution of power within organizations are problematic, the bottom have very little power and huge responsibil...
AutoNDA by SimpleDocs

Related to Power distance

  • Cellular Phone Executive is eligible to receive one cellular telephone issued through the Employer's corporate account for use on the Employer's business. The phone will remain the property of the Employer and must be returned upon termination of Executive's employment with the Employer.

  • Cell Phone Employee shall be provided with a cell phone, with e-mail capabilities, at Board expense. As a condition of receipt of said cell phone, employee is expected to be reachable as necessary and appropriate by the Superintendent and Board President for the thorough and efficient operation of the School District. Incidental personal use shall be permitted. Employees shall have the option of being reimbursed for the use of a personal smartphone in the amount of fifty dollars ($50.00) per month instead of accepting a district cell phone. As a condition of this reimbursement, employee must a) be reasonably available at all times via the personal phone; and b) take reasonable measures to protect the confidentiality of student and staff information being transmitted to and through said phone.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Cell Phones The College follows the State’s Cell Phone Policy. Employees who receive cell phones from the College shall also abide by this Policy. The College shall provide the Policy to any employee who is given a cell phone. Employees are responsible for the cost of all personal calls. While the College anticipates some incidental personal use of cell phones, it is also expected that such use is infrequent.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Workstation/Laptop encryption All workstations and laptops that process and/or store DHCS PHI or PI must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as Advanced Encryption Standard (AES). The encryption solution must be full disk unless approved by the DHCS Information Security Office.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!