Power Plants Sample Clauses

Power Plants. In the event Lessee, or a public utility, pursuant to ▇▇▇▇▇▇'s operations hereunder, desires to construct any plant or building site and is required to have fee title for such purpose, then Lessee shall pay occupier the fair market value for the surface of such plant or building site and the severance damages, if any, to the parcel from which such plant or building site is taken.
Power Plants. In this input sheet, power plants installed in the modelled energy system can be defined. • Electric capacity: Here the total electric capacity of all power plants (non-CHP) in the energy system should be inserted. If no power plant is in the modelled system, keep this empty or at zero. • Efficiency: Here the yearly average efficiency of all power plants (non-CHP) should be inserted. • Fuel usage: Share of fuel usage in the yearly fuel input to the power plants. The share is relative, so the total does not need to be 100%. • Costs for the power plants: Here the total investment costs, technical lifetime (from the time of installa- tion) as well as the variable and fixed operation and maintenance costs are inserted for the power plants. Check methodologies for this input in D3.1, Section 5.
Power Plants. The Power Plants shall be delivered on or before the below listed delivery dates: Quantity Part Number Unit Price Total Delivery Date 6 TBD $627,500 $3,765,000 December 1998 (Power Plant with Grid Independent Parallel; High Grade Heat) Services Price
Power Plants. In this input sheet, power plants installed in the modelled energy system can be defined.
Power Plants. Buyer intends to utilize the following Power Plants in accordance with this Agreement:

Related to Power Plants

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Projects There shall be a thirty (30) km free zone around the projects excluding the Metro Vancouver Area. For local residents, kilometers shall be paid from the boundary of the free zone around the project. Workers employed by any contractor within an identified free zone who resides outside of that same free zone will be paid according to the Kilometer Chart from the project to their residence less thirty