Power System Operators II Floaters Sample Clauses

Power System Operators II Floaters. Full-time Power System Operators II who are employed with or hired by the City between July 1 and December 31 of each year shall receive twelve (12) hours of additional leave with pay, during the fiscal year. Full- time Power System Operators II who are hired by the City between January 1 and June 30 of each year shall receive six (6) hours of additional leave with pay during the fiscal year.
AutoNDA by SimpleDocs

Related to Power System Operators II Floaters

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • System Operations Each party, at its own expense, shall provide and maintain the equipment, software, services and testing necessary to transmit Data Communications to, and receive Data Communications from the parties’ respective Receipt Computers.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • SYSTEM OPERATION The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

Time is Money Join Law Insider Premium to draft better contracts faster.