Preconstruction Services at all Phases of Design Work Sample Clauses

Preconstruction Services at all Phases of Design Work. Design Build Entity shall perform all necessary Preconstruction Services to refine the Design Work and to ensure that the Project is constructable and consistent with the Target GMP, including, without limitation, designing the project utilizing a Target Value Design approach, and performing a Life Cycle Analysis(es), value engineering analysis(es) on building components (to determine the best value based on initial cost, life expectancy, cost of operation and maintenance), and a constructability review(s). All costs for Preconstruction Services are included in the Total Contract Amount.
AutoNDA by SimpleDocs

Related to Preconstruction Services at all Phases of Design Work

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR

  • Preconstruction Services During the Design & Preconstruction Phase, the Design-Builder shall provide such design and preconstruction services as are necessary to properly advance the Project. Without limiting the generality of the foregoing, during the Preconstruction Phase, the Design-Builder shall: (i) work with its Architect and any design consultants to advance the design for the Project in consultation with Client Agency, the Department and its Program Manager; (ii) obtain bids from trade subcontractors to perform the work described in the Design Development Documents and provide bid tabulations to the Department; (iii) engage in any value engineering and scoping exercises necessary to return the cost of the work to the Project Budget; (iv) engage in preconstruction activities, including identifying any long-lead items; (v) develop a GMP proposal for the Project; and (vi) enter into a GMP for the Project. Throughout the Design & Preconstruction Phase, the Design-Builder shall schedule and attend regular meetings with the Department, the Program Manager and the Architect. A list of preconstruction deliverables is set forth in Exhibit C.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Completion of Work The Contractor agrees to complete the work on, or before October 29, 2021.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services. A. Applicants are encouraged to emphasize the following components in the design of their projects. Projects must: 1. Use a collaborative approach to maximize existing community resources and avoid duplication of effort; 2. Enhance systems and local processes to make it easier for people to transition to, from, and between services; 3. Address barriers to ensure services are accessible to people regardless of setting or location; and 4. Promote improvement and positively impact health and well-being through coordinated service delivery. B. To be effective, services and activities provided or made available as part of the Proposed Project should have policies and procedures in place and include with the application as an attachment that: 1. Delineate the timely provision of services; 2. Deem Client eligibility and service provision as soon as possible and no later than 30 calendar days from initial request; 3. Require staff to assess and prioritize Client needs; 4. Implement with model fidelity to an evidence-based program or based upon best available research; 5. Plan in partnership with the person and are inclusive; 6. Provide in an environment that is most appropriate and based on a person’s preference including reasonable clinic/reception wait times that are not a barrier to care; 7. Provide referral sources for Clients that cannot be served or receive a specific service; 8. Are culturally and linguistically sensitive; 9. Tailor services to a person’s unique strengths and needs; 10. Manage funds to ensure established Clients continuity of care throughout budget year; 11. Continue to provide services to established Clients after allocated funds are expended; 12. Have processes to identify and eliminate possible barriers to care; 13. Do not deny services due to inability to pay; 14. Have appropriate key personnel and required staff to meet the medical and health needs of Clients; 15. Bill services appropriately and timely through TMHP; 16. Effectively communicate and document information related to health care needs with next steps available to Client; 17. Establish outreach and education plan for the community; and 18. Outline successful delivery of direct clinical services to Clients By submitting an Application under this RFA, the Applicant certifies that Applicant has or will have at time of grant award services, policies, or procedures that conform with the requirements in this section as applicable. HHSC, in its sole discretion, may request to review relevant documentation during the project period as necessary to ensure program fidelity.

  • Construction Work The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction.

  • Developer’s Attachment Facilities (“DAF”). Developer shall, at its expense, design, procure, construct, own and install the DAF, as set forth in Appendix A hereto.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.