PREVENTIVE WORK Sample Clauses

PREVENTIVE WORK. There is a comprehensive legislation regarding environment and working environment, which is relevant for everyone working with chemicals. In addition, Chalmers sets internal requirements for how certain things should be handled. All instructions, requirements and guidelines that apply to us at Chalmers have been collected in a single routine: xxxx://xxx.xxxxxxxx.xx/insidan/EN/about-­‐chalmers/environmental-­‐work/policies/chemical-­‐safety-­‐ routine (English) xxxx://xxx.xxxxxxxx.xx/insidan/SV/om-­‐chalmers/miljo/hallbart-­‐campus/kemikalier1301 (Swedish). This routine helps you to handle chemicals in a correct way. All lab users working with chemicals must watch the short and informative film about safe handling of chemicals at Chalmers, xxxx://xxxxx.xxx/84758383.
AutoNDA by SimpleDocs

Related to PREVENTIVE WORK

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • Unsafe Work (a) An employee may exercise their right to refuse to do unsafe work pursuant to Section 3.12 of the Occupational Health and Safety Regulations outlined in Information Appendix B.

  • Overtime Work A. Overtime pay is to be paid at the rate of one and one- half (1½) times the basic hourly straight-time rate.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.

  • Finishing Work It has been clearly understood by the Alottee, that the Occupancy Certificate/Completion Certificate, as the case may be, are issued by the concerned authorities, when the entire civil construction work of the apartment is complete and the apartment is in a habitable state, however, to prevent any loss or damage, the internal fittings, furnishings and finishing work is done after obtaining completion certificate/occupancy certificate as the case may be. Further the internal fittings, furnishings and finishing work may also depend upon the choice of the Allottee. Therefore to ensure that there is no loss or damage to the internal fittings, furnishings and finishing work and the same may be carried on as per the choice of the Allottee, internal works such as fitting of switch boards, doors, sanitary fittings, plumber fittings like water taps/showers etc., final colour coat on the internal walls, floor tiles or any other internal work of like nature, shall be completed after obtaining occupancy certificate/completion certificate and before handing over the possession of the apartment to the Allottee.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!