PRIOR ENVIRONMENTAL ASSESSMENT ACTIVITIES Sample Clauses

PRIOR ENVIRONMENTAL ASSESSMENT ACTIVITIES. ‌ Previous environmental investigations at the Property have been completed in 2008, 2011, 2012, 2018 and 2019 as summarized in Wood’s Phase I Environmental Site Assessment report dated August 22, 2019 (Wood 2019a), and Initial Summary Report dated October 15, 2019 (Wood 2019b). In 2019, CTGR signed a Prospective Purchaser Agreement (PPA) with the DEQ agreeing to complete assessment and cleanup actions at the Property in exchange for environmental liability protections. In line with PPA requirements, CTGR must now conduct assessment and cleanup activities including: 1) high priority assessment and cleanup needed to contain known and suspected areas of contamination, prevent contamination from spreading via the Property’s stormwater system and other preferential pathways, and prepare the on-Property office building for near-term use by the CTGR; and 2) additional areas where environmental data gaps must be assessed and where focused cleanup is needed to prepare the Property for reuse. Property contaminants of concern (COCs) consist of heavy metals, petroleum hydrocarbons, polychlorinated biphenyls (PCBs), volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs) including polycyclic aromatic hydrocarbons (PAHs), and/or dioxins/furans in soil and groundwater (Wood, 2019a). Soil and groundwater data collected during previous investigations indicated additional investigation of Property COCs is warranted in the following locations in the northwestern portion of the Property: 1. Near previous sampling locations F01-01 and F01-02 in the parking lot west of Building 01 and west of former underground storage tanks (USTs) (PAHs and/or lead); 2. Near previous sampling location F07-01 at the northeast corner of Building 07 (PAHs and naphthalene); 3. Near previous sampling locations B-16 and GP-17 north and northeast of former Building 15 (Mill D, demolished) (PAHs and/or lead); 4. Near previous sampling locations GP07 and F16-01 in vacated Front Street/Building 16 (PAHs, arsenic and lead); 5. Near previous sampling location GP15 in vacated Main Street east of Building 25/26 (PAHs); 6. Near previous sampling locations B-2 through B-5 east of Buildings 41/42A/44 (arsenic and lead); 7. Near previous sampling locations TD-01 and TD-02 in the parking lot north of the former chip storage area and west of former USTs (PAHs); 8. Near previous sampling location B-00 xx Xxxx Xxxxxx west of the former service station (petroleum hydrocarbons, VOCs and lead). His...
AutoNDA by SimpleDocs

Related to PRIOR ENVIRONMENTAL ASSESSMENT ACTIVITIES

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Environmental Assessments Foreclose on or take a deed or title to any commercial real estate without first conducting a Phase I environmental assessment of the property or foreclose on any commercial real estate if such environmental assessment indicates the presence of a Hazardous Substance in amounts which, if such foreclosure were to occur, would be material.

  • Environmental Audits There are no environmental audits, evaluations, assessments, studies or tests relating to the Corporation except for ongoing assessments conducted by or on behalf of the Corporation in the ordinary course.

  • Periodic Review of Costs of Environmental Compliance In the ordinary course of its business, the Company conducts a periodic review of the effect of Environmental Laws on the business, operations and properties of the Company and its subsidiaries, in the course of which it identifies and evaluates associated costs and liabilities (including, without limitation, any capital or operating expenditures required for clean-up, closure of properties or compliance with Environmental Laws or any permit, license or approval, any related constraints on operating activities and any potential liabilities to third parties). On the basis of such review and the amount of its established reserves, the Company has reasonably concluded that such associated costs and liabilities would not, individually or in the aggregate, result in a Material Adverse Change.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Environmental Audit If required by the Administrative Agent, reports and other information in form, scope and substance satisfactory to the Administrative Agent and prepared by environmental consultants satisfactory to the Administrative Agent, concerning any environmental hazards or liabilities to which any Credit Party may be subject with respect to such Additional Mortgaged Property; and

  • Preparation of Environmental Reports At the request of the Administrative Agent from time to time if the Administrative Agent reasonably suspects the presence of any Hazardous Materials on any property of the Borrower or its Subsidiaries, provide to the Administrative Agent within sixty (60) days after such request, at the expense of the Borrower, an environmental site assessment report for any Specified Real Estate described in such request, prepared by a nationally recognized environmental consulting firm (or other environmental consulting firm reasonably acceptable to the Administrative Agent), indicating the presence or absence of Hazardous Materials and the estimated cost of any compliance, removal or remedial action in connection with any Hazardous Materials on such properties; without limiting the generality of the foregoing, if the Administrative Agent determines at any time that a material risk exists that any such report will not be provided within the time referred to above, the Administrative Agent may retain an environmental consulting firm to prepare such report at the expense of the Borrower, and such Loan Party hereby grants and agrees to cause any Subsidiary that owns any property described in such request to grant at the time of such request to the Administrative Agent, such firm and any agents or representatives thereof an irrevocable non-exclusive license, subject to the rights of tenants, to enter onto their respective properties to undertake such an assessment.

  • Environmental Studies Promptly conduct and complete, at Borrower’s expense, all such investigations, studies, samplings and testings as may be requested by Lender or any governmental authority relative to any substance, or any waste or by-product of any substance defined as toxic or a hazardous substance under applicable federal, state, or local law, rule, regulation, order or directive, at or affecting any property or any facility owned, leased or used by Borrower.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Environmental Audits and Reports As soon as practicable following receipt thereof, copies of all final environmental audits, investigations, analyses and reports of any kind or character, whether prepared by personnel of Holdings or any of its Subsidiaries or by independent consultants, Government Authorities or any other Persons, with respect to significant environmental matters at any Facility that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Effect or with respect to any Environmental Claims that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Effect.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!