Process Production rate Sample Clauses

Process Production rate. The manufacture of a caisson with the caisson dock methodology can be carried out in 7- 15 days working continuously in a double turn: • average concreting speed: 45 m3/h; • average sliding speed: 4.2 m/day. Production process description Caissons are manufactured sheltered from the surge in a floating dock, which is specifically designed for the construction of reinforced concrete maritime caissons. The floating dock is basically a metal pontoon flanked by metallic turrets. It performs immersion and re-floating manoeuvres with ballasting and deballasting tanks that allow launching operations of concrete caissons built on its deck to be performed. It has auxiliary elements that allow to perform this operation, in particular: • structures for supporting formwork; • formworks; • sliding equipment; • concrete distribution equipment; • ballasting equipment; and • work platforms. The assembly of the bottom slab reinforcement is performed on a barge ready for this purpose, which allows the assembly independently of the caisson construction. Once the reinforcement of the bottom slab has been prepared and assembly on the auxiliary pontoon, it is moved to the dock, previously submerged, where the reinforcement grid is suspended from the structure through steel wires, removing then the auxiliary pontoon and proceeding to the grid descent and placement at the base of the floating dock. When the reinforcement of the bottom slab has been moved to the dock proceeds the placement of the formwork of the bottom slab of the caisson and the concreting of it. After the concreting operation of the bottom slab, it proceeds to the placement of the first section of the shaft reinforcement and the descent of the sliding-formwork supporting structure for continue with concreting of the rest of the caisson. The sliding formwork consists of metal sheets and form the horizontal section of the shaft of the caisson. The inner cells formworks are attached to the adjacent cells formworks and, in necessary, to the outer formworks by yokes (special pieces that maintain the separation between various panels while rigidifying the assembly). These yokes are suspended from the structure by cables and therefore they move jointly. The sliding equipment consists of a series of hydraulic jacks that move upwards along metal bars arranged for this purpose by jaws, dragging in its movement the structure and the formwork hanging from it. Usually the concrete plant is located at the working site, althou...
AutoNDA by SimpleDocs

Related to Process Production rate

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Product Labeling The labeling of all Licensed Products sold or offered for sale under this Agreement shall expressly state that the Licensed Product is manufactured under a license from the Medicines Patent Pool.

  • Annual Production Program document describing the forecasts for Production and handling of Oil, Gas, water, special fluids, and waste arising from the Production process of each Development Area or Field.

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Salary Packaging In compliance with the Catholic Education Commission of Western Australia’s policy statement, salary packaging shall be available to employees.

Time is Money Join Law Insider Premium to draft better contracts faster.