Origin Criteria For the goods that meet the origin criteria, the exporter should indicate in Box 8 of this Form, the origin criteria met, in the manner shown in the following table: Circumstances of production or manufacture in the country named in Box 11 of this form: Insert in Box 8
Acceptance Criteria 6.7.2.1. During the test there shall be no evidence of:
Evaluation Criteria 5.2.1. The responses will be evaluated based on the following: (edit evaluation criteria below as appropriate for your project)
Exclusion Criteria Subjects fulfilling any of the following criteria are not eligible for participation in this study.
Performance Criteria The Performance Criteria are set forth in Exhibit A to this Agreement.
Promotional Criteria Subject to the utilisation of the skills, as required by the Employer, an employee remains at this level until he/she has developed the skills to allow the employee to effectively perform the tasks required of this function and is assessed to be competent to perform effectively at a higher level or has successfully completed appropriate training to ASF level 1 and has the demonstrated skills to perform at a higher level. An employee must be prepared to undertake appropriate training. LEVEL 3
Selection Criteria Each Contract is secured by a new or used Motorcycle. No Contract has a Contract Rate less than 1.00%. Each Contract amortizes the amount financed over an original term no greater than 84 months (excluding periods of deferral of first payment). Each Contract has a Principal Balance of at least $500.00 as of the Cutoff Date.
Additional RO Review Criteria (1) In addition to the requirements in Subparagraph 34A, the RO must:
Criteria (1) Annual Evaluation Criteria. All performance evaluations shall be based upon assigned duties, and shall carefully consider the nature of the assignment in terms, where applicable, of:
Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.