PVC Flushing Sample Clauses

PVC Flushing. Cistern White / Colour PVC Flushing Cistern for water closets and urinals shall be built and conforming to IS 7231-1994(Specifications of PVC high level and low level flushing cistern for water closets and urinals). It shall besolid moulded with valveless syphonic fitting. Manually operated with one PVC ball valve. Horizontally pluggedtype and with inbuilt polyethylene of float. Flushing pipe of required length for cistern including coupling andbend shall be as per manufacturer. The PVC flushing cistern shall be high level or low level of capacity 10 litres single flush/dual flush type as indicated. The parts of single/dual flush system in a cistern shall be xxxxx IS. The cistern shall be manufactured from high density polyethylene (HDPE) IS 7328-1992 or polystyrenehigh impact IS 2267-1972 or polypropylene or Acrylonitrile-butadiene-styrene (ABS) or Glass fibre reinforcedplastic (GRP) as indicated. The chain shall be hot- dip galvanized steel wire or inter locked nonferrous metal asindicated. The coupling nut and lock nut shall be of non-ferrous metal or Hot-dip galvanized steel / malleableiron or injection-moulded (HDPE)/ polyacetal. The thickness of the body including cover at any point shall notbe less than 2mm for GRP and not less than 3mm for other material.

Related to PVC Flushing

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Modern Slavery You hereby affirm your compliance with the Modern Slavery Xxx 0000 and associated guidance. You confirm (a) that you have read, are familiar with and shall not perform an act or omission which is in contravention with, the letter or spirit of the Act; and (b) you carry out regular, meaningful and comprehensive due diligence procedures and have internal policies in place to address any suspected human rights abuse in your business and Group where applicable.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • WATERBEDS The Tenant: (check one)

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • VOETSTOOTS The PROPERTY is sold: 8.1. Voetstoots in accordance with the Sectional Plan and the participation quota endorsed thereon with the opening of the Sectional Title Register, or as they are endorsed already, and any amendments or adjustments thereto from time to time in accordance with the terms of the Act and without any warranties express or implied, the SELLER shall not be liable for any patent or latent defects. Should the extent of the Section or of the PROPERTY differ from that which is contained in the title deed or sectional plan or any amendment thereto, the SELLER shall not be liable for any shortfall or be entitled to any compensation for any surplus. 8.2. Subject to all the conditions and Regulations of the Act. 8.3. The PURCHASER acknowledges that this is not a construction contract and that he is purchasing a completed unit. The PURCHASER shall not have the right to interfere in any way with the building operations of the SELLER’S employees. He shall also have no right to retention. This Clause is also applicable in the case of the bank holding back any retention amount out of its own accord or on request of the PURCHASER. 8.4. The SELLER undertakes to erect the unit according to the general building standards as set by Financial Institutions. The unit is be registered with the NHBRC. 8.5. Should a dispute arise or be declared, such dispute shall be resolved by an Arbitrator appointed by the Developer. The costs in respect thereof shall be borne by the unsuccessful party. Pending the outcome of the dispute, the PURCHASER shall be obliged to pay the outstanding amount to the Conveyancers who shall hold it in trust.