Rail Siding Sample Clauses

Rail Siding. By no later than November 1, 2004, Genesis shall have obtained property rights to a rail siding sufficient for stockpiling and loading concentrates onto rail cars for shipment to one or more purchasers. Genesis shall provide Royal Gold with monthly reports on the status of its efforts to obtain those property rights until it has obtained same.
AutoNDA by SimpleDocs
Rail Siding. The State will upon six (6) months prior notice in writing in that behalf given to it by the Company make available at the cost of the Company for the exclusive use of the Company a rail connection to the Manjimup‑Pemberton railway line at such point on the boundary of the site as may be mutually agreed by the parties.
Rail Siding. BNSF will complete grading work suitable for the future construction of a 10,000 foot rail siding in conjunction with and adjacent to the Wye. BNSF will report average daily train traffic over the Wye on an annual basis for five years following activation of the new rail line. MnDOT has identified a theoretical capacity of the Wye track at 12 trains per day. BNSF’s annual reporting on average daily traffic volume enables the Public Partners to compare actual train activity versus that threshold. In the event annual average daily traffic volume exceeds the 12 trains per day theoretical capacity during the reporting period, the Parties agree to meet to discuss the network conditions leading to the threshold being exceeded and, if jointly determined to be necessary, implement operational or other measures to direct movement of train traffic over the Wye rather than the Willmar Terminal.

Related to Rail Siding

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Trailers You are insured against claims arising out of your ownership, use or operation of any trailer or its equipment, provided that such trailer is not being towed by, attached to or carried on a motorized vehicle.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Bicycles Bicycles or other vehicles shall not be permitted anywhere inside or on the sidewalks outside of the Building, except in those areas designated by Landlord for bicycle parking.

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • NON-SMOKING UNIT ENTRY BY OWNER

  • Leave Loading The employer and the individual employee must have genuinely made the agreement without coercion or duress.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!