Ramps. Ramps shall be removed and/or reconstructed as needed to accommodate the Basic Configuration. DB Contractor shall design and construct ramps at the approximate location and with the tie-ins or connections to facilities having the orientation shown on the Schematic Design. For example, a ramp shown as a right lane exit or entrance on the Schematic Design may not be designed and constructed as a left lane exit or entrance, even if the ramp is at the approximate location shown on the Schematic Design. DB Contractor shall design and construct direct connectors at the approximate location and with the tie-ins or connections to facilities having the orientation shown on the Schematic Design. For example, a direct connector shown as a right lane exit or entrance on the Schematic Design may not be designed and constructed as a left lane exit or entrance, even if the ramp is at the approximate location shown on the Schematic Design.