Ready Mix Concrete Sample Clauses

Ready Mix Concrete. General specifications shall be as described under- Reinforced cement concrete specifications & shall generally comply with the requirements of IS : 456 - 2000. Ready mixed concrete is the concrete delivered at site from a Central Plant. The delivery is made by either agitator truck or truck mixer in a plastic condition requiring no further treatment before being placed in position in which it is to set and xxxxxx. The ready mix concrete shall conform to IS 4926, Specification for Ready Mixed Concrete is subject to the following: o The ready mixed concrete shall be Centrally Mixed Concrete unless otherwise specifically mentioned.
AutoNDA by SimpleDocs
Ready Mix Concrete. Where concrete for the project is to be supplied from a ready-mix concrete plant, the Contractor shall furnish to the Engineer an affidavit or statement of record from the ready-mix concrete supplier from whom he proposes to secure concrete for the project; and the affidavit or record shall show that such supplier has satisfactorily furnished concrete of quality specified herein and in quantity desired to projects of similar size and nature or to the Alabama Department of Transportation. The Contractor shall also furnish to the Engineers an inspection report from an approved Testing Laboratory, which report shall state that the ready-mix concrete plant from which the Contractor proposed to secure concrete for the project is currently capable of producing concrete of quality specified herein and in quantities required for satisfactory prosecution of the project; and that the plant is equipped with all controls, devices, recorders, dispensers for introduction of admixtures, etc., as specified herein. Truck mixers for transportation of ready-mix concrete shall be equipped with accurate water meters and revolution counters as described in portions of these Specifications concerning batching and mixing of concrete.

Related to Ready Mix Concrete

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

Time is Money Join Law Insider Premium to draft better contracts faster.