WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.
Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Lost Keys, Lock Outs The Resident will be responsible for the cost of replacing lost keys (e.g., room key, mailbox key, etc.) at a cost determined by the Manager, to a maximum of $20.00 per key. If the Resident is locked out of the Resident’s Room, the Resident will pay a fee for letting the Resident into the Room, to a maximum of $5.00, or will be provided with a temporary key to be returned immediately after use. Failure to return a temporary card in the time allotted will result in a replacement fee to a maximum of $20.00.
STRIKES OR LOCK-OUTS During the term of this Collective Agreement the Union agrees that there shall be no strike and the Employer agrees that there shall be no lock-out. Subject to any Labour Relations Board (or any succeeding body) directives, if an employee employed under the terms of this Collective Agreement refuses in good conscience to cross a legal picket line, the employee shall be considered to be absent without pay, and it shall not be considered a violation of this Agreement nor shall it be grounds for disciplinary action.
Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.
CLEANING UP 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: xxxx://xxx.xxx.xxxxx.xx.xx/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions. 4.15.2 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about. the Project as well as all his tools, construction equipment, machinery and surplus materials and shall leave the premises in a clean and satisfactory condition. 4.15.3 If the Contractor fails to clean up at the completion of the Work, the State may do so as provided in Paragraph 3.4 and the cost thereof shall be charged to the Contractor.
Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.
Leave Loading The employer and the individual employee must have genuinely made the agreement without coercion or duress.
DEBRIS Contractor shall be responsible for the prompt removal of all debris which is a result of this contractual service.