Resources with Energy Duration Limitations Sample Clauses

Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): THIS AGREEMENT is made and entered into this day of , 20 by and between , a organized and existing under the laws of the State of (“Requestor”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and a organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Requestor, NYISO and Connecting Transmission Owner each may be referred to as a “Party,” or collectively as the “Parties.”
AutoNDA by SimpleDocs
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Maximum sustained injection (in MW) over the Developer-selected duration; Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the DeveloperInterconnection Customer- selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): Commented [A1]: NYISO Comment: Relocated from Appendix 3 of Att. X (30.14) 53 to Attachment HHLFIP – LARGE FACILITY MODIFICATION REQUEST
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!