Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): THIS AGREEMENT is made and entered into this day of , 20 by and between , a organized and existing under the laws of the State of (“Requestor”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and a organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Requestor, NYISO and Connecting Transmission Owner each may be referred to as a “Party,” or collectively as the “Parties.”
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Maximum sustained injection (in MW) over the Developer-selected duration; Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the DeveloperInterconnection Customer- selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): Commented [A1]: NYISO Comment: Relocated from Appendix 3 of Att. X (30.14) 53 to Attachment HHLFIP – LARGE FACILITY MODIFICATION REQUEST