Responsibility For Use (a) The Company alone will be responsible for furnishing, or arranging for a third party to furnish, all data and information required by the Documentation and the specifications therein for the Licensed System to function and perform in accordance with the Documentation, other than the data and information residing in the Licensed System in connection with BNYM’s performance of the Core Services. BNYM shall have no liability or responsibility for any Loss caused in whole or in part by the Company’s or a Permitted User’s exercise of the Licensed Rights or use of the Licensed System or by data or information of any nature inputted into the Licensed System by or under the direction or authorization of Company or a Permitted User; provided, however, this Section 2.5 shall not relieve BNYM of its obligation to act in accordance with its obligations under the Main Agreement. Company shall be responsible and solely liable for the cost or expense of regenerating any output or other remedial action if the Company, a Permitted User or an agent of either shall have failed to transmit properly and in the correct format any data or information, shall have transmitted erroneous or incorrect information or data, or shall have failed to timely verify or reconcile any such data or information when it is generated by the Licensed System (“Data Faults”).
Responsibility for Content Vendor is solely responsible for administration, content, intellectual property rights, and all materials at Vendor’s website. DIR reserves the right to require a change of listed content if, in the opinion of DIR, it does not adequately represent the Contract.
Responsibility for Damage Resident is solely responsible for any damage, defacement or loss arising within the assigned bedroom space. All assigned residents of an apartment are jointly and severally responsible for any damage, defacement or loss to common areas, other parts of the Property, fixtures or appliances, except for the portion of damages over $100,000 where it is finally established that Resident or one or more other residents of the apartment were solely at fault for the entire loss, in which case such person(s) will be solely responsible. Resident is fully responsible for the conduct of Resident’s guests, visitors, licensees and invitees (“Guests”), including without limitation harm to individuals or damage or defacement of any part of the Property or its fixtures or property of third parties (including other residents) by such Guests.
Responsibility for Evaluation Within each school the Principal will be responsible for the evaluation of employees assigned to that school. Evaluation will be made by the Principal or a qualified administrator. An employee assigned to more than one school will be evaluated by the Principal of the school in which the employee is assigned for the greater amount of time, with input provided by the Principal of the other school. Any Principal or person charged with the responsibility of evaluation of employees may involve other staff and students in the process if acceptable to the certificated teacher being evaluated.
Responsibility of Contractor a. Contractor shall be held strictly responsible for the proper performance of all work covered by the Contract Documents, including all work performed by Subcontractors. All work performed under this Contract shall comply in every respect to the rules and regulations of all agencies having jurisdiction over the Project or any part thereof. b. Contractor shall submit Verified Reports as defined in §§4-336 and 4-343 (c), Group 1, Chapter 4, Part I, Title 24, California Code of Regulations (“CCR”). The duties of the Contractor are as defined in §4-343, Group 1, Chapter 4, Part I, Title 24, of the CCR. Contractor shall keep and make available a copy of Title 24 of the CCR at the job site at all times. c. Where, because of short supply, any item of fabricated materials and/or equipment, indicated on drawings or specified is unobtainable and it becomes necessary, with the consent of the Project Manager, to substitute equivalent items differing in details or design, the Contractor shall promptly submit complete drawings and details indicating the necessary modifications of the work. This provision shall be governed by the terms of the General Conditions regarding Submittals: Shop Drawings, Cuts and Samples. d. With respect to work performed at and near a school site, Contractor shall at all times take all appropriate measures to ensure the security and safety of students and staff, including, but not limited to, ensuring that all of Contractor’s employees, Subcontractors, and suppliers entering school property strictly adhere to all applicable District policies and procedures, e.g., sign-in requirements, visitor badges, and access limitations.
Responsibility for Equipment City shall not be responsible for any damage to persons or property as a result of the use, misuse or failure of any equipment used by Contractor, or by any of its employees, even though such equipment be furnished, rented or loaned to Contractor by City.
No Responsibility for Title, etc So long as and to the extent that it is in the exercise of reasonable care, the Custodian shall not be responsible for the title, validity or genuineness of any property or evidence of title thereto received or delivered by it pursuant to this Agreement.
Responsibility of PFPC (a) PFPC shall be under no duty to take any action on behalf of the Fund except as specifically set forth herein or as may be specifically agreed to by PFPC in writing. PFPC shall be obligated to exercise care and diligence in the performance of its duties hereunder, to act in good faith and to use its best efforts in performing services provided for under this Agreement. PFPC shall be liable for any damages arising out of PFPC's failure to perform its duties under this Agreement to the extent such damages arise out of PFPC's willful misfeasance, bad faith, negligence or reckless disregard of such duties. (b) Without limiting the generality of the foregoing or of any other provision of this Agreement, PFPC shall not be under any duty or obligation to inquire into and shall not be liable for (A) the validity or invalidity or authority or lack thereof of any Oral Instruction or Written Instruction, notice or other instrument which conforms to the applicable requirements of this Agreement, and which PFPC reasonably believes to be genuine; or (B) subject to Section 10, delays or errors or loss of data occurring by reason of circumstances beyond PFPC's control, including acts of civil or military authority, national emergencies, labor difficulties, fire, flood, catastrophe, acts of God, insurrection, war, riots or failure of the mails, transportation, communication or power supply. (c) Notwithstanding anything in this Agreement to the contrary, neither PFPC nor its affiliates shall be liable to the Fund for any consequential, special or indirect losses or damages which the Fund may incur or suffer by or as a consequence of PFPC's or its affiliates' performance of the services provided hereunder, whether or not the likelihood of such losses or damages was known by PFPC or its affiliates. (d) Notwithstanding anything in this Agreement to the contrary, the Fund shall not be liable to PFPC nor its affiliates for any consequential, special or indirect losses or damages which PFPC or its affiliates may incur or suffer by or as a consequence of PFPC's performance of the services provided hereunder, whether or not the likelihood of such losses or damages was known by the Fund.
Responsibility for Property Except as expressly set forth in Section 3.25, Contractor shall limit its operations to the Stage 2 Site. Contractor shall plan and conduct its operations so that neither Contractor nor any of its Subcontractors or Sub-subcontractors shall (i) enter upon lands (other than the Stage 2 Site and Off-Site Rights of Way and Easements) or waterbodies in their natural state unless authorized by the appropriate owner or entity; (ii) close or obstruct any utility installation, highway, waterway, harbor, road or other property unless Permits are obtained and authorized by the appropriate entity or authority; or (iii) disrupt or otherwise interfere with the operation of any portion of any pipeline, telephone, conduit or electric transmission line, ditch, navigational aid, dock or structure unless otherwise specifically authorized by the appropriate entity or authority. The foregoing includes damage arising from performance of the Work through operation of Construction Equipment or stockpiling of materials. If damage occurs to Subproject 1 or Subproject 2 prior to substantial completion of such applicable Subproject 1 or Subproject 2, liability for such damage shall be governed by the Stage 1 EPC Agreement.
Responsibility for Damages Contractor is responsible for all damage that occurs as a result of Contractor’s fault or negligence or that of its’ employees, agents, or representatives in connection with the performance of this Contract. Contractor shall immediately report any such damage to people and/or property to the Contract Administrator.