Retaining Walls and Concrete Barriers. Eleven new retaining walls would be installed at the locations listed in Table 5-3 and shown in Attachment B. The Build Alternative may require the relocation of two existing sound walls along northbound and southbound I-680, just north of Xxxxxx Valley Boulevard. The sound walls would be reconstructed along the tops of Retaining Walls 599 and 600. Areas between retaining walls and Right of Way fences would be accessible from MVP’s and walk gates. Table 5-3 lists the details of the proposed retaining walls. See Attachment C, APS plan sheets, for locations of retaining walls within the project area. Caltrans standard Type 60 MG barrier would be constructed as a median barrier between the express lanes in the project limits. Aesthetic treatments for retaining and sound walls, as well as concrete median barriers, will be implemented to reduce visual impacts and glare. Table 5-3: Proposed Retaining Walls Wall No. Fill or Cut Location Max Design Height (ft.) Length (ft.) Type of Wall RW-153 Fill Northbound I-680 right shoulder south of Xxxxxxx Road 10 455 Caltrans Type 1(Mod) on Pile RW-162 Cut Northbound I-680 median near Xxxxxxx Road 10 880 Caltrans Type 7 (Mod) on Spread Footing RW-180 Cut Northbound I-680 right shoulder 14 490 Soil Nail RW-213 Cut/Fill Northbound I-680 median 20 8,649 Soil Nail RW-310 Fill Northbound I-680 right shoulder at Sunol Blvd. 12 450 Caltrans Type 1(Mod) on Spread Footing RW-424 Fill Northbound I-680 right shoulder between Xxxxxx Ave. and Las Positas Blvd. 9 6,645 MSE RW-579 Fill Northbound I-680 right shoulder before Dublin 19 26 Soldier Pile RW-581 Fill Northbound I-680 right shoulder between Dublin Blvd. and Xxxxxx Valley Blvd. 12 1,593 Caltrans Type 1 (Mod) on Pile RW-599 Fill Northbound I-680 outside widening north of Xxxxxx Valley Blvd. 12 3,194 Retaining Wall Type 1(Mod) RW-600 Fill Southbound I-680 outside widening north of Xxxxxx Valley Blvd. 18 2,900 Retaining Wall Type 1 (Mod) RW-633 Cut Southbound I-680 outside widening 10 941 Soil Nail
AutoNDA by SimpleDocs

Related to Retaining Walls and Concrete Barriers

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.

  • Safety Glasses Section 1. The City shall supply prescription safety glasses with plastic lenses to employees who are required to wear safety glasses and who are members of the classifications contained in Appendix C to this contract. Safety glasses which are authorized must be industrial grade safety glasses which meet or exceed the requirements of ANSI Specification Z87. 1. All employees who are required to wear safety glasses shall also be required to wear side xxxxxxx, either permanent or snap-on, whenever an eye hazard exists. Solid tinted glasses will not be approved unless required by prescription. Photogray, progressive, scratch coating and/or anti-glare lenses may be considered for those employees who primarily work outdoors or as prescribed. In the event that additional classes are identified as needing either prescription safety glasses or protective eyewear, such classes may be added to the classification list in Appendix C upon approval of PAGE and the City. Section 2. The City agrees to pay the full cost of required prescription safety glasses, with frames not to exceed $75.00. This excludes the cost of the eye examination which will be the responsibility of the employee. The effected employees will be allowed one (1) replacement of safety glasses every two (2) years. In the event the safety glasses become lost, unserviceable, or broken on the job, the employee must present a written request for replacement to the Department Head and Human Resources Director. If the employee breaks his safety glasses while on the job, the Department shall replace the glasses at no cost to the employee. The replacement of lost glasses or glasses that are broken off the job will be at the discretion of the Department Head and Human Resources Director. If an employee has been provided safety glasses by the City, the employee shall be permitted to retain possession of the glasses after separation from the City without reimbursing the City for any costs associated with the glasses. Section 3. An employee who is required to wear prescription safety glasses must present a written request to his department head or designated representative. Section 4. The employee must obtain a current prescription and the employee is authorized the use of sick leave not to exceed two (2) hours to accomplish this examination. The employee will obtain a purchase order from the Department Head prior to ordering the safety glasses. The employee will present the purchase order to the appropriate vendor when ordering. The vendor will contact the appropriate Department Head when the glasses are ready for delivery. The Department Head will then notify the employee who will present himself at the vendor for fitting and pickup. Section 5. In the event a probationary employee has been issued safety glasses and terminates his employment with the City for any reason during the probationary period, he shall be required to reimburse the City for any expenses incurred in the purchase of safety glasses.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.

  • Safety Footwear 1. The State will provide employees in the positions listed in Section 3 below, and employees who are currently required to wear safety footwear by Department Work Rules, an allowance of one hundred fifty dollars ($150.00) for replacement of safety footwear. This allowance will be paid to employees on a semiannual basis, with half paid in January and half paid in July to eligible employees on the payroll at the time of the payments. Employees of Departments with work rules that provide such safety footwear will not be eligible for the safety footwear allowance. 2. Safety footwear purchased must meet ANSI standards where applicable. Requirements for the wearing of safety footwear will be in accordance with work rules published by the State. 3. Positions required to wear safety footwear:

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!