Rough Proportionality Standard Sample Clauses

Rough Proportionality Standard. Pursuant to section 2820, subdivision (b)(9) of the California Fish and Game Code, the Implementing Entity, County, Cities and Flood Control District must “ensure that the implementation of mitigation and conservation measures on a plan basis is roughly proportional in time and extent to the impact on habitat or Covered Species.” Section 2820, subdivision (b)(9) also requires a statement of consequences of the failure to acquire lands in a timely manner. For purposes of the HCP/NCCP, whether “rough proportionality” is met shall be determined pursuant to Chapter 8.6.1 of the HCP/NCCP. If at any time CDFG provides written notification that rough proportionality on a plan basis has not been met, then the Implementing Entity, County, Cities and Flood Control District will either: (1) regain rough proportionality within forty-five (45) days; or (2) enter into an agreement with CDFG within forty-five (45) days, which will set a course of action to expeditiously regain rough proportionality. The agreement may include any of a variety of commitments or adjustments to the NCCP designed to regain rough proportionality, including but not limited to, a plan to acquire, restore, or enhance lands of appropriate vegetation or land-cover type expeditiously. If the Implementing Entity, County, Cities and Flood Control District do not regain rough proportionality within forty-five (45) days or enter into an agreement with CDFG within forty-five (45) days setting a course of action to regain rough proportionality, CDFG will suspend or revoke the State Permit, in whole or in part, pursuant to California Fish and Game Code section 2820, subdivision (c). The Parties agree that partial suspension or revocation may include removal of one or more species from the Covered Species list for purposes of the State Permit or reducing the geographic scope of the Take authorization provided by the State Permit. Before suspending or revoking the State Permit in whole due to a failure to maintain rough proportionality, DFG shall meet with the Permittees to determine whether mutually agreeable modifications to the HCP/NCCP would obviate a suspension or revocation in whole. The Parties agree that if CDFG suspends or revokes the State Permit, the Permittees may, based on the HCP/NCCP, apply for one or more CESA incidental take permits under section 2081, subdivision (b), of the California Fish and Game Code to replace the State Permit, in which case CDFG shall expeditiously review the applicat...
AutoNDA by SimpleDocs

Related to Rough Proportionality Standard

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.

  • CHANGE IN CLASSIFICATION SPECIFICATIONS Section 1. The Employer shall notify the Union of intended classification studies.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Salary Schedule Progression Employees shall progress from step to step in salary grade on the basis of satisfactory job performance based upon established standards of performance. Seasonal employee's initial anniversary date shall be established after being in pay status for two thousand eighty (2,080) hours. Such date shall then be used for annual performance evaluation and step progression consideration. When an employee's anniversary date falls on any day from the first day of a pay week through Wednesday of the pay week, the employee's merit increase shall be effective as of the first day of the pay week within which the anniversary date falls. Otherwise, the merit increase shall be effective on the first day of the next pay week. Grievances arising from the denial of merit increases shall not be arbitrable under this Agreement but shall be processed as follows:

  • Salary Scales 1. In the settlement of the Kindergarten Teachers, Head Teachers and Senior Teachers' Collective Agreement 2000-2002 the parties committed themselves to the implementation of pay parity for kindergarten teachers. Senior teacher K3 and K4 salaries were benchmarked to the base salary (excluding the roll-based supplementary component) of a primary U2 and U3 principal respectively.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.