Secondary Schools Allo ance Sample Clauses

Secondary Schools Allo ance. The secondary school allowance shall be based on the following conditions: Standard boarding bursary; A boarding bursary for the term breaks, excluding December/January, if the pupils do not return to the Chathams for those periods; The cost of return air fares for the four term breaks; The cost of internal travel between airport and the child’s school for the December/January period only; For pupils' resident on Pitt Island, free passage between Pitt and Chatham Islands at the beginning and end of each school term.
AutoNDA by SimpleDocs

Related to Secondary Schools Allo ance

  • Specialist Schools Allowance Funding equivalent to that which a maintained school with the Academy's characteristics would receive in respect of their participation in the specialist schools programme. In the year of conversion, this may continue to be paid by the Local Authority;

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Using Student feedback in Educator Evaluation ESE will provide model contract language, direction and guidance on using student feedback in Educator Evaluation by June 30, 2013. Upon receiving this model contract language, direction and guidance, the parties agree to bargain with respect to this matter.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • TOOLS AND CLOTHING 30.1 An employee shall be required to provide himself with the ordinary hand tools of his trade, based on established trade union practices at the time of signing of this Agreement. EPSCA and the Union shall establish an appropriate tool list for each trade. Each Employer will provide, insofar as is practical, separate facilities for storing the tools of each trade, but shall not be held responsible for losses, except as noted hereunder:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • STRS PICK-UP A. The Board shall pick-up contributions to the State Teachers’ Retirement System paid on behalf of the employees in the bargaining unit utilizing the salary reduction method under the following terms and conditions:

Time is Money Join Law Insider Premium to draft better contracts faster.