Seepage and Infiltration Sample Clauses

Seepage and Infiltration. The District agrees that it will adopt and enforce written rules, regulations, and provisions to ensure that connections to the System will be such as to prevent as much as feasibly possible the discharge into said System of anything except sewage; and in particular, but without limitation thereto, that no drains shall be installed or connected in such a manner that any rainwater or other surface waters are permitted to enter the District’s System; and, in addition, that adequate safeguards will be taken to prevent any abnormal seepage or infiltration or discharge of any solid matter into said System. The District agrees that throughout the term of this Agreement the District will promulgate and enforce an active program to reduce the inflow and infiltration into the City’s System. Additionally, the District shall tender to the City a report at least annually on the progress of such program. Prior to the execution of this Agreement by the City, the District shall supply the Director with a copy of such rules, regulations, and contracts, including statement of measures designed to enforce such provision. The District shall initiate whatever lawful actions are necessary to disconnect any customer who, following reasonable notice, refuses to remove noncompliant connections. The District will inspect all connections at the time made and continue to monitor the District’s System as a whole to detect infiltration and unpermitted connections at least one (1) time per month or as otherwise may be ordered by the Director. The District further agrees to continuously maintain the District’s System so as to prevent any abnormal seepage or infiltration or discharge of any solid matter into said System. Failure to do so shall be an Event of Default notwithstanding any payments pursuant to the following paragraph.
AutoNDA by SimpleDocs

Related to Seepage and Infiltration

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Smoke Free Environment The Lessor shall make all parts of the leased premise smoke-free. "

  • Restrictions on Use of Hazardous Substances Borrower will not cause or permit the presence, use, disposal, storage, or release of any Hazardous Substances, or threaten to release any Hazardous Substances, on or in the Property. Borrower will not do, nor allow anyone else to do, anything affecting the Property that: (i) violates Environmental Law; (ii) creates an Environmental Condition; or (iii) due to the presence, use, or release of a Hazardous Substance, creates a condition that adversely affects or could adversely affect the value of the Property. The preceding two sentences will not apply to the presence, use, or storage on the Property of small quantities of Hazardous Substances that are generally recognized to be appropriate to normal residential uses and to maintenance of the Property (including, but not limited to, hazardous substances in consumer products).

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • CURVE WIDENING The minimum widening placed on the inside of curves is:  6 feet for curves of 50 to 79 feet radius.  4 feet for curves of 80 to 100 feet radius.

  • Intrusion Detection All systems involved in accessing, holding, transporting, and protecting PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY that are accessible via the Internet must be protected by a comprehensive intrusion detection and prevention solution.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.