Shutdown Power Costs Sample Clauses

Shutdown Power Costs. The Shutdown Power Cost shall be calculated in accordance with Equation D-1c: Equation D-1c Shutdown Power Cost ($) = Shutdown Power Requirement (MWh)  Energy Price ($/MWh) The Energy Price shall be equal to the total auxiliary power (including Energy for Shutdowns) costs charged to the Facility by its supplier of end-use Energy for the billing cycle in which the Shutdown was initiated divided by the total auxiliary power (including Energy for Shutdowns) consumed at the Facility during such billing cycle. The Shutdown Power Requirement is given in Table D-1 below.
AutoNDA by SimpleDocs

Related to Shutdown Power Costs

  • Start-Up Costs 4.1.1 The Government of Ontario will provide:

  • Transportation Costs The cost of transporting a Warranted Part claimed to be defective to the facilities designated by the Seller and for the return therefrom of a repaired or replaced Warranted Part shall be borne by the Buyer.

  • TRAVELLING ZONE EXPENSES 1.01 Work performed outside the city limits shall be termed Out-of-Town Work.

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • Service Costs Service Costs are direct and indirect expenditures incurred in support of Petroleum Operations in the Contract Area, including expenditures on warehouses, piers, marine vessels, vehicles, motorized rolling equipment, aircraft, fire and security stations, workshops, water and sewerage plants, power plants, housing, community and recreational facilities and furniture and tools and equipment used in these activities. Service Costs in any Year shall include the costs incurred in such Year to purchase and/or construct the said facilities as well as the annual costs of maintaining and operating the same, each to be identified separately. All Service Costs shall be regularly allocated as specified in Sections 2.2.5, 2.3.5 and 2.4 to Exploration Costs, Development Costs and Production Costs and shall be separately shown under each of these categories. Where Service Costs are made in respect of shared facilities, the basis of allocation of costs to Petroleum Operations hereunder shall be specified.

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in the Summary Schedule (attached) are formally approved as actual costs for fiscal year 2020-21, and as estimated costs for fiscal year 2022-23 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2022, for further allocation to federal grants and contracts performed by the respective county departments.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Training Costs All costs and expenses incurred by the Contractor in training as is required under Article 22 of the Contract.

  • Price Adjustments for OGS Centralized Contracts Periodic price adjustments will occur no more than twice per year on a schedule to be established solely by OGS. Pricing offered shall be fixed for the first twelve (12) months of the Contract term. Such price increases will only apply to the OGS Centralized Contracts and shall not be applied retroactively to Authorized User Agreements or any Mini-bids already submitted to an Authorized User. Price Decreases Price decreases may be made at any time. Additionally, some price decreases shall be calculated in accordance with Appendix B, section 17, Pricing.

  • Night Shift Differential 1. An employee who works an assigned night shift shall, in addition to his or her regular salary, be paid a night shift differential for each hour actually worked on the assigned night shift.

Time is Money Join Law Insider Premium to draft better contracts faster.