Site Characterization – Phase I Assessment Sample Clauses

Site Characterization – Phase I Assessment. The objective of this subtask is to conduct Phase I environmental site assessments, which will serve as the base assessment activity for the sites selected for funding under this grant. The Coalition will select a primary environmental consultant(s) who shall have the lead responsibility for conducting Phase I Assessments. The environmental consultant(s) shall have the responsibility to ensure that all Phase I site characterization and assessments carried out under this agreement will be performed in accordance with EPA's standard for All Appropriate Inquiries. The environmental consultant(s) shall use the practices in ASTM standard E1527-05 “Standard Practices for Environmental Site Assessment: Phase I Environmental Site Assessment Process,” or EPA's All Appropriate Inquiries Final Rule. If an ASTM Phase 1 Assessment has already been completed for any of the candidate properties, the environmental consultant(s) shall document when and by whom the Phase I was completed and a copy will be held in the Coalition’s project file. The Coalition is hopeful that between five (5) and ten (10) Phase I Assessments can be completed during the term of this project. The proposed budget for Phase I Assessments for this project is $50,000 total, with $10,000 provided from the petroleum budget and $40,000 from the hazardous waste budget. Specific milestones and deliverables for this subtask include:  Minimum five (5) Phase I Assessments completed.
AutoNDA by SimpleDocs

Related to Site Characterization – Phase I Assessment

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors:

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Performance Assessment 6.1 The Performance Plan (Annexure A) to this Agreement sets out key performance indicators and competencies that needs to be evaluated in terms of –

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

Time is Money Join Law Insider Premium to draft better contracts faster.