PROJECT FILE. For the Contract Wizard I introduced the notion of project. To contract a new .NET assembly the user has to create a new project. Given the right input parameters, provided through the GUI or command line, the class CW_PROJECT_HANDLER takes care of creating a new project file. The file stores the project name, working directory, assembly location, and assembly name. The project handler stores the file in the working directory. It has the same name as the project and the extension .cpr; an abbreviation for contract project. Table 8 shows the content of a sample project file. Project name: Account Working directory: D:\eth\DA\test\ Assembly location: D:\eth\DA\example\Accouting_Example\Account.dll Assembly name: Account.dll Table 8: Project file Besides creating a project file the project handler is also responsible for opening an existing project. It receives the path on the project file as argument in its creation procedure and then the feature read_project_file reads the content from the file and assigns it to public attributes of CW_PROJECT_HANDLER. An important job of the project handler is to load the assembly from the assembly path. The method load_from takes as argument the path where the assembly is located and returns the loaded assembly (2). The attribute assembly is of type ASSEMBLY, a class from the .NET Framework. While loading the assembly it is possible that the system throws an exception, for example FileNotFoundException (assembly file is not found) or BadImageFormatException (assembly file is not a valid assembly). Therefore it is important that the feature calling load_from catches the exception in a rescue clause and sets a flag if the assembly is not loaded (3). Table 9 shows the creation procedure of CW_PROJECT_HANDLER that creates a new project file and loads the assembly. make (an_assembly_name, an_assembly_path, a_working_directory, a_project_name: STRING) is -- Initialize Current with values for a new project. require -- …Strings not empty… local is_erroneous : BOOLEAN do if not is_erroneous then assembly_name := an_assembly_name (1) assembly_path := an_assembly_path working_directory := a_working_directory project_name := a_project_name create_project_file -- Load assembly assembly := assembly.load_from (assembly_path) is_assembly_loaded := True end ensure
PROJECT FILE. Assemble and maintain all records and files related to the project throughout the duration of the project (electronic and hard copy). The project files and complete indexes shall be delivered to the State at project closeout or as directed by the State.
PROJECT FILE. The Engineer shall maintain a Project File for each EA. Project File update shall be required as the project is ongoing.
PROJECT FILE. The project files will be maintained and stored at Xxxxxxx’x office in Birmingham, Alabama, for a minimum of three years.
PROJECT FILE. The Engineer shall maintain a Project File for the EA. Project File update shall be required as the project is ongoing. The State will review the file up to three (3) times during the course of the project, with the final review (and incorporation of any comments) comprising the Final Project File submittal. Deliverables: • Preliminary Draft Project File (electronic) • Draft Project File (1 electronic) • Final Project File (electronic) • Electronic files shall be furnished to the State on a CD/DVD or via the TxDOT Dropbox • Agency Coordination. Based on the information obtained during the preliminary field surveys, the Engineer will assist the State in initiating early coordination with the appropriate agencies that may have interests in the project study area, such as USFWS, TPWD, Texas Commission on Environmental Quality (TCEQ), Federal Emergency Management Agency (FEMA), and any other governmental agencies, groups, or individuals as determined by the State. The Engineer may prepare correspondence, maps, and/or meeting materials specific to the project for agency DocuSign Envelope ID: D0E29F2F-2A8C-4E32-A9B8-8EFA82530B8F WAs Used PeopleSoft Contract No. 7032 Legacy Contract No. 19-6SDP5001 review, as requested by the State. The Engineer will participate in these coordination efforts as necessary.
PROJECT FILE. Lender shall have received with respect to such Existing Xxxxxxx Hotel Project copies of:
PROJECT FILE. The Engineer shall maintain a Project File for the EA. Project File update shall be required as the project is ongoing. The State will review the file up to three (3) times during the course of the project, with the final review (and incorporation of any comments) comprising the Final Project File submittal. DocuSign Envelope ID: 798F7E2C-0AE6-40EE-BFB4-3AB848988972 Deliverables • Preliminary Draft Project File (electronic) • Draft Project File (1 electronic) • Final Project File (electronic) • Electronic files shall be furnished to the State on a CD/DVD or via the TxDOT Dropbox • Agency Coordination. Based on the information obtained during the preliminary field surveys, the Engineer will assist the State in initiating early coordination with the appropriate agencies that may have interests in the project study area, such as USFWS, TPWD, Texas Commission on Environmental Quality (TCEQ), Federal Emergency Management Agency (FEMA), and any other governmental agencies, groups, or individuals as determined by the State. The Engineer may prepare correspondence, maps, and/or meeting materials specific to the project for agency review, as requested by the State. The Engineer will participate in these coordination efforts as necessary.
PROJECT FILE. The Engineer shall maintain a Project File for the EA. Project File update shall be required as the project is ongoing. The State will review the file up to three (3) times during the course of the project, with the final review (and incorporation of any comments) comprising the Final Project File submittal. Deliverables • Preliminary Draft Project File (electronic) • Draft Project File (1 electronic) • Final Project File (electronic) • Electronic files shall be furnished to the State on a CD/DVD or via the State Dropbox • Agency Coordination. Based on the information obtained during the preliminary field surveys, the Engineer shall assist the State in initiating early coordination with the appropriate agencies that may have interests in the project study area, such as USFWS, TPWD, Texas Commission on Environmental Quality (TCEQ), Federal Emergency Management Agency (FEMA), and any other governmental agencies, groups, or individuals as determined by the State. The Engineer may prepare correspondence, maps, and/or meeting materials specific to the project for agency review, as requested by the State. The Engineer shall participate in these coordination efforts as necessary.
PROJECT FILE. A file to be kept by each partner agency containing all the personal information and documentation relevant to the information sharing process for the project.