SITE Conditions 现场条件 Sample Clauses

SITE Conditions 现场条件. At an appropriate timing point during the performance of this CONTRACT, CONTRACTOR shall inspect the SITE and availability of access routes to prepare for its SERVICES to be delivered. CONTRACTOR shall be fully responsible for the consequence to fail to comply with this obligation. 在履行本合同的适当时间内,承包商应当考察现场以及通行路径的可用情况以为其将提供的服务作出准备。承包应当自行承担全部后果若其怠于履行此项义务。
AutoNDA by SimpleDocs

Related to SITE Conditions 现场条件

  • Site Conditions A. Existing Site Conditions: Information with respect to the site of the Work given in drawings or specifications has been obtained by County's representatives and is believed to be reasonably correct, but the County does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all such information.

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • Differing Site Conditions (a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site(s), of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.

  • Unsafe Conditions In accordance with 29 CFR § 1977, occasions might arise when an employee is confronted with a choice between not performing assigned tasks or subjecting himself/herself to serious injury or death arising from a hazardous condition at the workplace. If the employee, with no reasonable alternative, refuses in good faith to expose himself/herself to the dangerous condition, he/she would be protected against subsequent discrimination. The condition causing the employee's apprehension of death or injury must be of such a nature that a reasonable person, under the circumstances then confronting the employee, would conclude that there is a real danger of death or serious injury and that there is insufficient time, due to the urgency of the situation, to eliminate the danger by resorting to regular statutory enforcement channels. In addition, in such circumstances, the employee, where possible, must also have sought from his Employer, and been unable to obtain, a correction of the dangerous condition.

  • Release Conditions As used in this Agreement, "Release Conditions" shall mean the following:

  • Space Conditions All pipes passing through floors, walls, and ceilings shall be installed with sufficient space between them to permit installation of pipe insulation and floor, wall, and ceiling plates without cutting of insulation or plates. Roughed-in dimensions shall be prepared by the Contractor to accomplish this requirement. The Contractor shall locate all equipment that must be serviced, operated, or maintained in fully accessible positions. This provision includes but is not limited to valves, traps, cleanouts, motors, controllers, switchgear, drain points, filter, access doors, and fire dampers. If spaces, dimensions, or other design conditions do not permit compliance with the present article, the Contractor shall file a request in writing with the Design Professional for additional instructions, furnishing a copy to the Owner.

  • Termination Conditions This Agreement terminates upon the earlier of any of the following events: 18.1. Podmínky ukončení platnosti smlouvy Platnost této smlouvy skončí, jakmile nastane kterákoliv z následujících událostí:

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions:

  • SUSPENSIVE CONDITIONS 18.1 The Contract is subject to the suspensive condition that the Purchaser obtains a loan in the amount reflected in clause 7 of the SCHEDULE, forming part of the Purchase price payable by the Purchaser to the Seller for the Property, from a bank or other financial institution, against the security of a first mortgage bond over the Property in favour of such bank or financial institution, such loan to be approved in writing by such bank or financial institution within the period stipulated in clause 9 of the SCHEDULE.