STAGE 2 (Main Assessment Sample Clauses

STAGE 2 (Main Assessment. Assessment of the client’s conformity to all the standard(s) requirement and their effective implementation of the established management system. The Stage 2 assessment will consist of:  information and evidence of conformity to all requirements of management system standard or other normative documents  performance monitoring, measuring, reporting and reviewing against key performance objectives and targets (consistent with the expectations in the applicable management system standard or other normative documents)  client’s management system ability and its performance regarding meeting of applicable statutory, regulatory and contractual requirements  operational control of client’s processes  internal auditing and management review  management responsibility for the client’s policies Following the completion of the Stage 2 audit, a detailed report is submitted to the client. All nonconformities have to be closed and evidence provided on the next audit.
AutoNDA by SimpleDocs

Related to STAGE 2 (Main Assessment

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Impact Assessment If Service Provider desires to make any change, upgrade, replacement or addition that may have an adverse impact or require changes as described in Section 9.6(c) or increase the risk of Service Provider not being able to provide the Services in accordance with this Agreement or violate or be inconsistent with DIR Standards or Strategic Plans, then Service Provider shall prepare a written risk assessment and mitigation plan (1) describing in detail the nature and extent of such adverse impact or risk, (2) describing any benefits, savings or risks to DIR or the DIR Customers associated with such change, and (3) proposing strategies to mitigate any adverse risks or impacts associated with such change and, after consultation and agreement with DIR, implement the plan.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Comprehensive Assessment an initial and ongoing part of the member-centered planning process employed by the interdisciplinary team (IDT) to identify the member’s outcomes and the services and supports needed to help support those outcomes. It includes an ongoing process of using the knowledge and expertise of the member and caregivers to collect information about:

  • Data Protection Impact Assessment If, pursuant to Data Protection Law, Customer (or its Controllers) are required to perform a data protection impact assessment or prior consultation with a regulator, at Customer’s request, SAP will provide such documents as are generally available for the Cloud Service (for example, this DPA, the Agreement, audit reports or certifications). Any additional assistance shall be mutually agreed between the Parties.

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors:

  • Formative Assessment The process used to assess progress towards attaining goals set forth in Educator plans, performance on standards, or both. This process may take place at any time(s) during the cycle of evaluation, but typically takes place at mid-cycle.

Time is Money Join Law Insider Premium to draft better contracts faster.