EPP session-‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a session command plus the reception of the EPP response for only one EPP session command. For the login command it will include packets needed for starting the TCP session. For the logout command it will include packets needed for closing the TCP session. EPP session commands are those described in section 2.9.1 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.
EPP command RTT Refers to “EPP session-‐command RTT”, “EPP query-‐command RTT” or “EPP transform-‐command RTT”.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5
EPP query-‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a query command plus the reception of the EPP response for only one EPP query command. It does not include packets needed for the start or close of either the EPP or the TCP session. EPP query commands are those described in section 2.9.2 of EPP RFC 5730. If the RTT is 5-‐times or more the corresponding SLR, the RTT will be considered undefined.
Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.
Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.
Hospital-Association Committee (a) There shall be a Hospital-Union Committee comprised of representatives of the Hospital, one of whom shall be the Chief Nursing Officer or designate and of the Union, one of whom shall be the Bargaining Unit President or designate. The number of representatives is set out in the Appendix of Local Provisions and the membership of the Committee may be expanded by mutual agreement. (b) The Committee shall meet every two (2) months unless otherwise agreed and as required under Article 8.01 (a) (iv). The duties of chair and secretary shall alternate between the parties. Where possible, agenda items will be exchanged in writing at least five (5) calendar days prior to the meeting. A record shall be maintained of matters referred to the Committee and the recommended disposition, if any, unless agreed to the contrary. Copies of the record shall be provided to Committee members. (c) The purpose of the Committee includes: i) promoting and providing effective and meaningful communication of information and ideas, including but not limited to workload measurement tools and the promotion of best practices. Such communication may include discussion of nursing workload measurement and patient acuity systems. The Hospital will provide, upon request, information on workload measurement systems applicable to nursing currently used by the Hospital, and evaluations completed by the Hospital of such systems. ii) reviewing professional responsibility complaints with a view to identifying trends and sharing organizational successes and solutions, making joint recommendations on matters of concern including the quality and quantity of nursing care and discussing the development and implementation of quality initiatives; iii) making joint recommendations to the Chief Nursing Officer on matters of concern regarding recurring workload issues including the development of staffing guidelines, the use of agency nurses and use of overtime; iv) dealing with complaints referred to it in accordance with the provisions of Article 8, Professional Responsibility; v) discussing and reviewing matters relating to orientation and in- service programs; vi) promote the creation of full-time positions for nurses, and discuss the effect of such changes on the employment status of the nurses. This may include the impact, if any, on part-time and full-time, job sharing and retention and recruitment. (d) The Hospital agrees to pay for time spent during regular working hours for representatives of the Union attending at such meetings. (e) Where a Committee representative designated by the Union attends Committee meetings outside of her or his regularly scheduled hours, she or he will be paid for all time spent in attendance at such meetings at her or his regular straight time hourly rate of pay. Such payment shall be limited to two (2) Committee representatives per meeting.
Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.