Strategy To Provide Stability Sample Clauses

Strategy To Provide Stability. The Company and the Union have agreed to a number of procedures which will enable us to reduce the need for layoffs during business downturns. The following summarizes various approaches to employment stabilization that are included in our Agreement.
AutoNDA by SimpleDocs

Related to Strategy To Provide Stability

  • Staffing Consultant will designate in writing to Authority its representative, and the manner in which it will provide staff support for the project, which must be approved by Authority. Consultant must notify Authority’s Contract Representative of any change in personnel assigned to perform work under this Contract, and the Authority’s Contract Representative has the right to reject the person or persons assigned to fill the position or positions. The Authority’s Contract Representative shall also have the right to require the removal of the Consultant’s previously assigned personnel, including Consultant’s representative, provided sufficient cause for such removal exists. The criteria for requesting removal of an individual will be based on, but not limited to, the following: technical incompetence, inability to meet the position’s qualifications, failure to perform, poor attendance, ethics violation, unsafe work habits, or damage to Authority or other property. Upon notice for removal, Consultant shall replace such personnel with personnel substantially equal in ability and qualifications for the positions and shall submit the proposed replacement personnel qualification and abilities to the Authority, in writing, for approval.

  • Strategic Planning Facilitate the effective alignment of IT requirements/ Information Resource Management (IRM) plans with strategic business plans and program initiatives. Management Improvements: Development and implementation of improved systems and business practices to optimize productivity and service delivery operations (e.g., analysis, and implementation of improvements in the flow of IT work and program processes and tool utilization, including business system analysis, identification of requirements for streamlining, re-engineering, or re-structuring internal systems/business processes for improvement, determination of IT solution alternatives, benchmarking).

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Maintenance and Support Services As long as you are not using the Help Desk as a substitute for our training services on the Tyler Software, and you timely pay your maintenance and support fees, we will, consistent with our then-current Support Call Process:

  • Operational All expenses for running and operating all machinery, equipments and installations comprised in the Common Areas, including elevators, diesel generator set, changeover switch, pump and other common installations including their license fees, taxes and other levies (if any) and expenses ancillary or incidental thereto and the lights of the Common Areas and the road network.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!