Submeters Sample Clauses

SubmetersNotwithstanding anything to the contrary in the Existing Lease, Landlord may, at its sole cost and expense, install submeters for all above-building standard equipment in or serving the Remaining Premises. Tenant shall pay Landlord, as Additional Rent, for Tenant's use of electricity pursuant to such submeters for such above-building standard equipment.
Submeters 
SubmetersLandlord shall have the right to meter or submeter the consumption of water and/or any other utilities in all or any portion of the Premises.

Related to Submeters

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.