Submittal Preparation Sample Clauses

Submittal Preparation. This is the signed and sealed submittal to be provided to the CRRMA for the final local letting review. The consultant will prepare a final plan submittal for CRRMA and stakeholder review. Hard copies and .pdfs of the submittal will be delivered to the CRRMA for distribution internally and to stakeholder reviewers. It is assumed that the following three (3) parties will perform independent reviews of the set: o CRRMA o City of El Paso (including ECM, EPDOT, and others) o Sun Metro
AutoNDA by SimpleDocs
Submittal Preparation. .1 Determine and verify the following: .1 Field measurements. .2 Field construction criteria. .3 Catalogue numbers and similar data.

Related to Submittal Preparation

  • Proposal Preparation The contractor shall assume all costs associated with preparation of proposals for task order awards under the proposal process as an indirect charge (B&P costs). The Government will not reimburse awardees for proposals as a direct charge.

  • Site Preparation Contractor shall not begin a project for which the site has not been prepared, unless Contractor does the preparation work at no cost, or until Region 4 ESC includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements.

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

  • Joint Preparation The preparation of this Agreement has been a joint effort of the parties and the resulting documents shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other.

  • Surface Preparation Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.

  • Construction Preparation Period 2.1.3 Construction Management Plan

  • DOCUMENT PREPARATION The Transfer/Deed shall, save for the Land Transfer Tax Affidavit, be prepared in registrable form at the expense of Seller, and any Charge/Mortgage to be given back by the Buyer to Seller at the expense of the Buyer. If requested by Buyer, Seller covenants that the Transfer/Deed to be delivered on completion shall contain the statements contemplated by Section 50(22) of the Planning Act, R.S.O.1990.

  • Planning and Preparation 1. Uses established local and the Core Curriculum Standards and Cumulative Progress Indicators as well as established local and state curriculum objectives in planning lessons.

  • Submittal Review 7.10.1 The A/E shall review Submittals such as Shop Drawings, Product Data, and Samples for conformity with design intent and conformity with the Contract Documents within 14 days of receiving Submittals or in accordance with the approved submittal schedule, or other period as mutually agreed by the A/E and Contractor.

  • Professional Preparation and Scholarship The certificated classroom teacher exhibits, in his/her performance, evidence of having a theoretical background and knowledge of the principles and methods of teaching, and a commitment to education as a profession.

Time is Money Join Law Insider Premium to draft better contracts faster.