Surface and Subsurface Investigation Sample Clauses

Surface and Subsurface Investigation. Job Order Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the City, as well as from the drawings and specifications made a part of this Contract. The City will provide to Job Order Contractor all subsurface investigation reports it has commissioned that reasonably reflect expected conditions at the location of the Job Order.
AutoNDA by SimpleDocs

Related to Surface and Subsurface Investigation

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Studies The clinical, pre-clinical and other studies and tests conducted by or on behalf of or sponsored by the Company or its subsidiaries that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus were and, if still pending, are being conducted in accordance in all material respects with all statutes, laws, rules and regulations, as applicable (including, without limitation, those administered by the FDA or by any foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA). The descriptions of the results of such studies and tests that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus are accurate and complete in all material respects and fairly present the published data derived from such studies and tests, and each of the Company and its subsidiaries has no knowledge of other studies or tests the results of which are materially inconsistent with or otherwise call into question the results described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus. Except as described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, neither the Company nor its subsidiaries has received any notices or other correspondence from the FDA or any other foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA with respect to any ongoing clinical or pre-clinical studies or tests requiring the termination or suspension of such studies or tests. For the avoidance of doubt, the Company makes no representation or warranty that the results of any studies, tests or preclinical or clinical trials conducted by or on behalf of the Company will be sufficient to obtain governmental approval from the FDA or any foreign, state or local governmental body exercising comparable authority.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • DISCOVERY OF HAZARDOUS MATERIALS If, during the performance of the Work, Contractor or Contractor’s subcontractor(s) encounter material believed to be asbestos, polychlorinated biphenyl (PCB), or any other identified or non-identified potentially hazardous material (which has not been rendered harmless and labeled as such), Contractor and Contractor’s subcontractor(s) shall immediately stop work in the area affected and report the condition, in writing, to District. The Work in the affected area shall not continue or be resumed except by written direction of District and by agreement by Contractor.

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Accident Investigations When an accident occurs involving the equipment or personnel of a Supporting Agency, the Protecting Agency shall immediately notify the jurisdictional and supporting agencies. As soon as practical, the Protecting Agency shall initiate an investigation of the accident. The investigation shall be conducted by a team of representatives from the affected agencies, as appropriate. As appropriate, the Parties agree that the Protecting Agency will provide notification of the accident to the National Transportation Safety Board, or the Occupational Safety and Health Administration and other appropriate Agencies.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

Time is Money Join Law Insider Premium to draft better contracts faster.