SURVEY REFERENCE POINTS. 1 Existing base horizontal and vertical control points are designated on drawings. .2 Locate, confirm and protect control points prior to starting Site work. Preserve permanent reference points during construction. .3 Make no changes or relocations without prior written notice to Contract Administrator. .4 Report to Contract Administrator when reference point is lost or destroyed, or requires relocation because of necessary changes in grades or locations. .5 Require surveyor to replace control points in accordance with original survey control.
AutoNDA by SimpleDocs
SURVEY REFERENCE POINTS. The Contractor shall locate and reference the project survey control network and establish Benchmarks at appropriate intervals along the line of the project for use by the Contractor in establishing horizontal and vertical controls necessary for the construction. If the Contractor or Sub Contractor destroys these locations, the Contractor shall re-establish these points. The Contractor's stakeout work shall be included in the contract unit price for the various items of work to which it is incidental.
SURVEY REFERENCE POINTS. Existing basic horizontal and vertical control points for the Project are those designated on the Drawings. Contractor shall locate and protect control points prior to starting Site Work and preserve all permanent reference points during construction. In addition Contractor shall: Make no changes or relocation without prior written notice to District and Architect. Report to District and Construction Manager when any reference point is lost or destroyed, or requires relocation because of necessary changes in grades or locations. Require surveyor to replace Project control points based on original survey control that may be lost or destroyed.
SURVEY REFERENCE POINTS. A. Existing basic horizontal and vertical control points for the Project are those designated on Drawings.
SURVEY REFERENCE POINTS. A. Existing basic horizontal and vertical control points for the Project are those designated on drawing. The successful bidder will be provided CADD copies (with stipulations) of the site layout to assist in the layout of the work.
SURVEY REFERENCE POINTS. 1 Primary horizontal and vertical survey reference points have been established by The Owner as specified in the Contract Documents. The Owner is responsible for the accuracy of the primary survey reference points.

Related to SURVEY REFERENCE POINTS

  • Reference Description Dates E/CAM/0305 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0306 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0307 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0308 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0309 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0310 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0311 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 Reference Description Dates E/CAM/0312 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0313 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0314 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0315 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0316 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0317 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0318 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0319 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0320 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0321 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0322 Deeds Grounds in Xxxxxxxx Xxxxxx xxx Xxxxxxx Xxxxxx; 1-21 (incl) St Paul's Terace, King's Road; six messuages in Canal Terrace, fronting Regent's Canal 1824-1832

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • CONTRACT EXHIBIT I PREFERRED PRICING AFFIDAVIT This preferred-pricing affidavit is entered into in accordance with section 216.0113, F.S., and as required by Contract No. 80101507-21-STC-ITSA (“Contract”) between (“Contractor”) and the Department of Management Services. As the person authorized by Contractor to sign this affidavit, I attest that the Contractor is in full compliance with the preferred-pricing clause of the Contract. Contractor’s Name: By: Signature Printed Name/Title Date: STATE OF COUNTY OF Sworn to (or affirmed) and subscribed before me this day of , by . Signature of Notary Vendor Name: FEIN# Vendor’s Authorized Representative Name and Title: Address: City, State, and Zip code: Phone Number: ( ) - E-mail: CORPORATE SEAL (IF APPLICABLE) (Print, Type, or Stamp Commissioned Name of Notary Public) [Check One] Personally Known OR Produced the following I.D.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Contract Exhibit J Quarterly Sales Report If a conflict exists among any of the Contract documents, the documents shall have priority in the order listed below:

  • THE SECOND SCHEDULE ABOVE REFERRED TO (UNIT) All That the Residential Flat / Apartment bearing No. containing a Carpet Area of Square Feet [Built-up Area whereof being Square Feet (inclusive of the area of the balcony(ies) / verandah(s) being Square Feet more or less) and Chargeable Area being Square Feet, which is inclusive of pro rata share in the Common Areas and Installations] more or less, With the Store Room bearing No. containing a Carpet Area of Square Feet [Built-up Area whereof being Square Feet and Chargeable Area being Square Feet, which is inclusive of pro rata share in the Common Areas and Installations] more or less, both on the floor of the Block at the said Premises described in the First Schedule hereinabove written and shown in the Plan annexed hereto, duly bordered thereon in “Red”. With exclusive right to use the Open Private Terrace attached to the said Apartment, containing an area of Square Feet, and shown in the Plan annexed hereto, duly bordered thereon in “ ”. With exclusive right to use the green / garden attached to the said Apartment, containing an area of Square Feet, and shown in the Plan annexed hereto, duly bordered thereon in “ ”. With right to park motor car/s (stack Parking) in the covered space in the Ground Floor of the Building, exact location to be identified by the Promoter on or before the Deemed Date of Possession. With right to park motor car/s (stack Parking) in the open compound of the said Premises, exact location to be identified by the Promoter on or before the Deemed Date of Possession. THE THIRD SCHEDULE ABOVE REFERRED TO PART-I (Common Areas and Installations)