Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
AIRCRAFT CONFIGURATION The guarantees defined below (the “Guarantees”) are applicable to the A319-100 Aircraft as described in the Standard Specification Ref. J 000 01000 Issue 6 dated 1st March 2007 equipped with:
Maintenance and Support Services If this Agreement is for IT goods or services, this section applies: Unless otherwise specified in this Agreement: The Contractor shall promptly provide the Court with all Upgrades, including without limitation: (i) all Upgrades generally made available by Contractor to its other customers; (ii) Upgrades as necessary so that the Work complies with the Specifications and Applicable Law (including changes in Applicable Law); (iii) Upgrades as necessary so that the Work operates under new versions or releases of the Court’s operating system or database platform; and (iv) all on-site services necessary for installation of Upgrades. Without limiting any other obligation of Contractor under this Agreement, Contractor represents and warrants that it will maintain services, equipment, software or any other part of the Work so that they operate in accordance with their Specifications and Documentation; and The Contractor shall respond to the Court within four (4) hours after the Court reports a Technical Support Incident (such hours all occurring during Standard M&S Hours) to Contractor. DELIVERY, ACCEPTANCE, AND PAYMENT Delivery. Contractor shall deliver to the Court the Deliverables in accordance with this Agreement, including the Statement of Work. Unless otherwise specified by this Agreement, Contractor will deliver all goods purchased by the Court “Free on Board Destination Freight Prepaid” to the Court at the address and location specified by the Court. Title to all goods purchased by the Court vests in the Court upon payment of the applicable purchase price. Contractor will bear the risk of loss for any Work being delivered until received by the Court at the proper location. All shipments by Contractor or its Subcontractors must include packing sheets identifying: this Agreement number, the Court’s purchase order number, item number, quantity and unit of measure, part number and description of the goods shipped, and appropriate evidence of inspection, if required. Goods for different Agreements shall be listed on separate packing sheets.
Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Functionality Customer is entitled to additional functionality previously purchased or bundled with the software if available in the version or update released on or after the start date of the Agreement. Customer acknowledges that certain functionality in current and previous software versions may not be available in future upgrades. Added functionality may require additional paid services (clinical and technical) to configure and support.
Uncovering and Correction of Work 12.1 The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of two years from the date of Substantial Completion, or by terms of an applicable special warranty required by the Contract Documents. The provisions of this Article apply to work done by Subcontractors as well as to Work done by direct employees of the Contractor. 12.2 At any time during the progress of the work, or in any case where the nature of the defects shall be such that it is not expedient to have them corrected, the Owner, at their option, shall have the right to deduct such sum, or sums, of money from the amount of the contract as they consider justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.
Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.
Statement of Work The Statement of Work to which Grantee is bound is incorporated into and made a part of this Grant Agreement for all purposes and included as Attachment A.
Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.