TASK 8 - TOPOGRAPHICAL SURVEY Sample Clauses

TASK 8 - TOPOGRAPHICAL SURVEY. Upon written notice to proceed, Consultant shall retain (as a subconsultant) and monitor the services of a surveying firm to perform surveying services for the project. The following survey shall beprovided. 1. Establish project control using Global Positioning System (GPS) methodology. Horizontal values will be based on the Texas State Plane Coordinate System, North American Datum of 1983, North Central Zone (4202) and scaled to surface using the Texas Department of Transportation grid to surface factor for Collin County (1.000152710). the vertical values will be based on GPS derived ellipsoid heights and adjusted to North American Vertical Datum of 1988 (NAVD88) elevations using Geoid 12B. Control Points will also be tied into the Town of Prosper Geodetic Control Network. 2. Gather topographical survey from the south edge of pavement of FM 1461 to 20 feet past the proposed TxDOT right-of-way line, from the centerline of Preston Road (SH 289) to the centerline of Xxxxxx Road (FM 2478), to include pavement edges, curb and gutter, buildings driveways, culverts, fences and gates, signs, mailboxes, tops and toes of slopes, spot elevations, trees six (6) inches and greater, surface locations of utilities and flowline elevations of sanitary and storm sewer manholes where accessible, and other surface features. 3. Request Texas 811 Ticket and mark utilities as marked by others. 4. Coordinate with the Town of Prosper to have Town utilities marked and survey the location of the Town utilities. 5. Provide a digital design survey drawing in AutoCAD format showing visible surface features located, an ASCII point file and a copy of field notes and field sketches.
AutoNDA by SimpleDocs

Related to TASK 8 - TOPOGRAPHICAL SURVEY

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Maps The maps service and features of the iOS Software (“Maps”), including map data coverage, may vary by region. When you use any location-based features within Maps, such as turn-by-turn navigation, traffic and local search, various location-related and usage information may be sent to Apple, including the real-time geographic location of your iOS Device, in order to process your request and help improve Maps. Such location and usage data is collected by Apple in a form that does not personally identify you. By using Maps, you agree and consent to Apple’s and its subsidiaries’ and agents’ transmission, collection, maintenance, processing, and use of this information, to provide and improve the Maps features and service, and other Apple products and services. You may disable the location-based functionality of Maps by going to the Location Services setting on your iOS Device and turning off the individual location setting for Maps. Certain Maps features will however be unavailable if you disable the Location Services setting, such as turn-by-turn navigation.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Geological and archaeological finds It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.

  • SITE EXAMINATION Contractor has examined the Site and certifies that it accepts all measurements, specifications and conditions affecting the Work to be performed at the Site. By submitting its quote, Contractor warrants that it has made all Site examination(s) that it deems necessary as to the condition of the Site, its accessibility for materials, workers and utilities, and Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowance of time or money will be allowed as to any other undiscovered condition on the Site.

  • Eye Examinations All represented employees, who are health service system members, shall be eligible for one (1) annual VDT examination and prescribed eyewear.

  • Contractor Certification regarding Boycotting Israel Pursuant to Chapter 2270, Texas Government Code, Contractor certifies Contractor (1) does not currently boycott Israel; and (2) will not boycott Israel during the Term of this Agreement. Contractor acknowledges this Agreement may be terminated and payment withheld if this certification is inaccurate.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!