Training Committee The parties to this Agreement may form a Training Committee. The Training Committee will be constituted by equal numbers of Employer nominees and ETU employee representatives and have a charter which clearly states its role and responsibilities. It shall monitor the clauses of this Agreement which relate to training and ensure all employees have equal access to training.
Technical Advisory Committee (TAC The goal of this subtask is to create an advisory committee for this Agreement. The TAC should be composed of diverse professionals. The composition will vary depending on interest, availability, and need. TAC members will serve at the CAM’s discretion. The purpose of the TAC is to: • Provide guidance in project direction. The guidance may include scope and methodologies, timing, and coordination with other projects. The guidance may be based on: o Technical area expertise; o Knowledge of market applications; or o Linkages between the agreement work and other past, present, or future projects (both public and private sectors) that TAC members are aware of in a particular area. • Review products and provide recommendations for needed product adjustments, refinements, or enhancements. • Evaluate the tangible benefits of the project to the state of California, and provide recommendations as needed to enhance the benefits. • Provide recommendations regarding information dissemination, market pathways, or commercialization strategies relevant to the project products. The TAC may be composed of qualified professionals spanning the following types of disciplines: • Researchers knowledgeable about the project subject matter; • Members of trades that will apply the results of the project (e.g., designers, engineers, architects, contractors, and trade representatives); • Public interest market transformation implementers; • Product developers relevant to the project; • U.S. Department of Energy research managers, or experts from other federal or state agencies relevant to the project; • Public interest environmental groups; • Utility representatives; • Air district staff; and • Members of relevant technical society committees. • Prepare a List of Potential TAC Members that includes the names, companies, physical and electronic addresses, and phone numbers of potential members. The list will be discussed at the Kick-off meeting, and a schedule for recruiting members and holding the first TAC meeting will be developed. • Recruit TAC members. Ensure that each individual understands member obligations and the TAC meeting schedule developed in subtask 1.11. • Prepare a List of TAC Members once all TAC members have committed to serving on the TAC. • Submit Documentation of TAC Member Commitment (such as Letters of Acceptance) from each TAC member. • List of Potential TAC Members • List of TAC Members • Documentation of TAC Member Commitment
CENTRAL LABOUR RELATIONS COMMITTEE C4.1 OPSBA, the Crown and OSSTF agree to establish a joint Central Labour Relations Committee to promote and facilitate communication between rounds of bargaining on issues of joint interest.
Technical Committee 1. The Technical Committee shall comprise: (a) nine experts representing different regions of the Agreement Area, in accordance with a balanced geographical distribution; (b) one representative from the International Union for Conservation of Nature and Natural Resources (IUCN), one from the International Waterfowl and Wetlands Research Bureau (IWRB) and one from the International Council for Game and Wildlife Conservation (CIC); and (c) one expert from each of the following fields: rural economics, game management, and environmental law. The procedure for the appointment of the experts, the term of their appointment and the procedure for designation of the Chairman of the Technical Committee shall be determined by the Meeting of the Parties. The Chairman may admit a maximum of four observers from specialized international inter- governmental and non-governmental organizations. 2. Unless the Meeting of the Parties decides otherwise, meetings of the Technical Committee shall be convened by the Agreement secretariat in conjunction with each ordinary session of the Meeting of the Parties and at least once between ordinary sessions of the Meeting of the Parties. 3. The Technical Committee shall: (a) provide scientific and technical advice and information to the Meeting of the Parties and, through the Agreement secretariat, to Parties; (b) make recommendations to the Meeting of the Parties concerning the Action Plan, implementation of the Agreement and further research to be carried out; (c) prepare for each ordinary session of the Meeting of the Parties a report on its activities, which shall be submitted to the Agreement secretariat not less than one hundred and twenty days before the session of the Meeting of the Parties, and copies shall be circulated forthwith by the Agreement secretariat to the Parties; and (d) carry out any other tasks referred to it by the Meeting of the Parties. 4. Where in the opinion of the Technical Committee there has arisen an emergency which requires the adoption of immediate measures to avoid deterioration of the conservation status of one or more migratory waterbird species, the Technical Committee may request the Agreement secretariat to convene urgently a meeting of the Parties concerned. These Parties shall meet as soon as possible thereafter to establish rapidly a mechanism to give protection to the species identified as being subject to particularly adverse threat. Where a recommendation has been adopted at such a meeting, the Parties concerned shall inform each other and the Agreement secretariat of measures they have taken to implement it, or of the reasons why the recommendation could not be implemented. 5. The Technical Committee may establish such working groups as may be necessary to deal with specific tasks.
Recognition of Union Stewards and Grievance Committee In order to provide an orderly and speedy procedure for the settling of grievances, the Employer acknowledges the rights and duties of the Union Stewards. The Xxxxxxx shall assist any Employee, which the Xxxxxxx represents, in preparing and presenting her grievance in accordance with the grievance procedure.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Technical Objections to Grievances It is the intent of both Parties of this Agreement that no grievance shall be defeated merely because of a technical error, other than time limitations in processing the grievance through the grievance procedure. To this end, an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance, in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.
Nurse Representatives & Grievance Committee (a) The Hospital agrees to recognize Association representatives to be elected or appointed from amongst nurses in the bargaining unit for the purpose of dealing with Association business as provided in this Collective Agreement. The number of representatives and the areas which they represent are set out in the Appendix of Local Provisions. (b) The Hospital will recognize a Grievance Committee, one of whom shall be chair. This committee shall operate and conduct itself in accordance with the provisions of the Collective Agreement and the number of nurses on the Grievance Committee is set out in the Appendix of Local Provisions. (c) It is agreed that Union representatives and members of the Grievance Committee have their regular duties and responsibilities to perform for the Hospital and shall not leave their regular duties without first obtaining permission from their immediate supervisor. Such permission shall not be unreasonably withheld. If, in the performance of their duties, a union representative or member of the Grievance Committee is required to enter a unit within the hospital in which they are not ordinarily employed they shall, immediately upon entering such unit, report their presence to the supervisor or nurse in charge, as the case may be. When resuming their regular duties and responsibilities, such representatives shall again report to their immediate supervisor. The Hospital agrees to pay for all time spent during their regular hours by such representatives hereunder.
Grievance Committee The Hospital will recognize a Grievance Committee composed of the Chief Xxxxxxx and not more than (as set out in Local Provisions Appendix) employees selected by the Union who have completed their probationary period. A general representative of the Union may be present at any meeting of the Committee. The purpose of the Committee is to deal with complaints or grievances as set out in this Collective Agreement. The Union shall keep the Hospital notified in writing of the names of the members of the Grievance Committee appointed or selected under this Article as well as the effective date of their respective appointments. A Committee member shall suffer no loss of earnings for time spent during their regular scheduled working hours in attending grievance meetings with the Hospital up to, but not including arbitration. The number of employees on the Grievance Committee shall be determined locally.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.